Nonstop flight route between Hambantota, Sri Lanka and Taichung, Taiwan, Republic of China:
Departure Airport:
Arrival Airport:
Distance from HRI to TXG:
Share this route:
Jump to:
- About this route
- HRI Airport Information
- TXG Airport Information
- Facts about HRI
- Facts about TXG
- Map of Nearest Airports to HRI
- List of Nearest Airports to HRI
- Map of Furthest Airports from HRI
- List of Furthest Airports from HRI
- Map of Nearest Airports to TXG
- List of Nearest Airports to TXG
- Map of Furthest Airports from TXG
- List of Furthest Airports from TXG
About this route:
A direct, nonstop flight between Mattala Rajapaksa International Airport (HRI), Hambantota, Sri Lanka and Taichung Airport(Taichung Ching Chuan Kang Airport) (TXG), Taichung, Taiwan, Republic of China would travel a Great Circle distance of 2,895 miles (or 4,659 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Mattala Rajapaksa International Airport and Taichung Airport(Taichung Ching Chuan Kang Airport), the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Mattala Rajapaksa International Airport and Taichung Airport(Taichung Ching Chuan Kang Airport). You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | HRI / VCRI |
Airport Names: |
|
Location: | Hambantota, Sri Lanka |
GPS Coordinates: | 6°17'20"N by 81°7'24"E |
Area Served: | Hambantota |
Operator/Owner: | Sri Lankan Government |
Airport Type: | Public |
Elevation: | 157 feet (48 meters) |
# of Runways: | 1 |
View all routes: | Routes from HRI |
More Information: | HRI Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | TXG / RCLG |
Airport Names: |
|
Location: | Taichung, Taiwan, Republic of China |
GPS Coordinates: | 24°15'52"N by 120°37'14"E |
Area Served: | Greater Taichung |
Operator/Owner: | Civil Aeronautics Administration Ministry of National Defense |
Airport Type: | Military/Civil |
Elevation: | 663 feet (202 meters) |
# of Runways: | 1 |
View all routes: | Routes from TXG |
More Information: | TXG Maps & Info |
Facts about Mattala Rajapaksa International Airport (HRI):
- This project will have two phases, with the first phase expected to be completed by the end of October 2012.
- Because of Mattala Rajapaksa International Airport's relatively low elevation of 157 feet, planes can take off or land at Mattala Rajapaksa International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The furthest airport from Mattala Rajapaksa International Airport (HRI) is Seymour Airport (GPS), which is located 11,719 miles (18,860 kilometers) away in Baltra Island, Galápagos Islands, Ecuador.
- The new international airport is expected to expand the local aviation industry whilst being a catalyst for the country's economic development enabling international trade, tourism, vocational training and employment.
- The second stage of the HIA project expansion works at the airport is to be completed by 2015.
- The airport is designed to facilitate for over 800 foreign passengers at peak hours and several local passengers per every 1000 km² in side the buildings.
- The closest airport to Mattala Rajapaksa International Airport (HRI) is Weerawila Airport (WRZ), which is located only 8 miles (13 kilometers) ESE of HRI.
- On March 2013, it was reported that certifications of compliance and certification of aerodrome was awarded to the Mattala Rajapaksa International Airport.
- Mattala Rajapaksa International Airport (HRI) currently has only 1 runway.
- The air traffic control tower of height 41m has been constructed at the highest elevation of the aerodrome.
- In addition to being known as "Mattala Rajapaksa International Airport", another name for HRI is "මත්තල රාජපක්ෂ ජාත්යන්තර ගුවන්තොටුපළமத்தல ராஜபக்ஷ பன்னாட்டு விமான நிலையம்".
- Construction of phase one began on 27 November 2009 at Mattala.
- The Runway dimensions are 3500m * 60m with 7.5m paved shoulders either side and 260m Runway safety area on both runway ends.
Facts about Taichung Airport(Taichung Ching Chuan Kang Airport) (TXG):
- Because of Taichung Airport(Taichung Ching Chuan Kang Airport)'s relatively low elevation of 663 feet, planes can take off or land at Taichung Airport(Taichung Ching Chuan Kang Airport) at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The furthest airport from Taichung Airport(Taichung Ching Chuan Kang Airport) (TXG) is Clorinda Airport (CLX), which is nearly antipodal to Taichung Airport(Taichung Ching Chuan Kang Airport) (meaning Taichung Airport(Taichung Ching Chuan Kang Airport) is almost on the exact opposite side of the Earth from Clorinda Airport), and is located 12,311 miles (19,813 kilometers) away in Clorinda, Formosa, Argentina.
- The closest airport to Taichung Airport(Taichung Ching Chuan Kang Airport) (TXG) is Taichung Airport(Taichung Ching Chuan Kang Airport) (RMQ), which is located only 0 mile (0 kilometer) N of TXG.
- In addition to being known as "Taichung Airport(Taichung Ching Chuan Kang Airport)", other names for TXG include "臺中航空站臺中清泉崗機場", "Táizhōng HángkōngzhànTáizhōng Qīngquángǎng Jīchǎng", "RMQ", "RCMQ" and "RMQ".
- Ching Chuan Kang Airport was constructed during the Japanese rule and was named Kōkan Airport.
- Taichung Airport(Taichung Ching Chuan Kang Airport) (TXG) currently has only 1 runway.
- Due to higher demand, a new international terminal began construction in July 2011.