Nonstop flight route between Chetwynd, British Columbia, Canada and Dabolim, Goa, India:
Departure Airport:
Arrival Airport:
Distance from YCQ to GOI:
Share this route:
Jump to:
- About this route
- YCQ Airport Information
- GOI Airport Information
- Facts about YCQ
- Facts about GOI
- Map of Nearest Airports to YCQ
- List of Nearest Airports to YCQ
- Map of Furthest Airports from YCQ
- List of Furthest Airports from YCQ
- Map of Nearest Airports to GOI
- List of Nearest Airports to GOI
- Map of Furthest Airports from GOI
- List of Furthest Airports from GOI
About this route:
A direct, nonstop flight between Chetwynd Airport (YCQ), Chetwynd, British Columbia, Canada and Goa International Airport (GOI), Dabolim, Goa, India would travel a Great Circle distance of 7,444 miles (or 11,981 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Chetwynd Airport and Goa International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Chetwynd Airport and Goa International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | YCQ / CYCQ |
Airport Name: | Chetwynd Airport |
Location: | Chetwynd, British Columbia, Canada |
GPS Coordinates: | 55°41'13"N by 121°37'36"W |
Operator/Owner: | District of Chetwynd |
Airport Type: | Public |
Elevation: | 1999 feet (609 meters) |
# of Runways: | 1 |
View all routes: | Routes from YCQ |
More Information: | YCQ Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | GOI / VOGO |
Airport Names: |
|
Location: | Dabolim, Goa, India |
GPS Coordinates: | 15°22'50"N by 73°49'53"E |
Operator/Owner: | Goa & Indian Navy |
Airport Type: | Public/Military |
Elevation: | 184 feet (56 meters) |
# of Runways: | 1 |
View all routes: | Routes from GOI |
More Information: | GOI Maps & Info |
Facts about Chetwynd Airport (YCQ):
- The closest airport to Chetwynd Airport (YCQ) is Hudson's Hope Airport (YNH), which is located 28 miles (44 kilometers) NNW of YCQ.
- Chetwynd Airport (YCQ) currently has only 1 runway.
- The furthest airport from Chetwynd Airport (YCQ) is East London Airport (ELS), which is located 10,296 miles (16,569 kilometers) away in East London, South Africa.
Facts about Goa International Airport (GOI):
- Military flight training at Dabolim is carried out on 5 days of the week from 0830 hrs to 1300 hrs, during which hours civilian flights cannot operate.
- Goa International Airport (GOI) currently has only 1 runway.
- Because of Goa International Airport's relatively low elevation of 184 feet, planes can take off or land at Goa International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Goa's estimated 700 international flights per year account for some 90% of the country's international charter tourist flights.
- The closest airport to Goa International Airport (GOI) is Belgaum Airport (IXG), which is located 62 miles (100 kilometers) ENE of GOI.
- The furthest airport from Goa International Airport (GOI) is Mataveri International Airport (IPC), which is located 11,596 miles (18,662 kilometers) away in Easter Island, Chile.
- In addition to being known as "Goa International Airport", another name for GOI is "Dabolim AirportAeroporto de Dabolim".
- Meanwhile, the Navy's title to Dabolim Airport land has been questioned by a member of parliament of Goa in relation to the plan to relocate the civil enclave to the Mopa civilian airport on the grounds that it is the state government of Goa which authorises land transfers in its jurisdiction.
- The foundation stone for the terminal was laid on 21 February 2009, the project work began in May 2010 and construction of the terminal began in May 2011.
- The airport is spread over 688 hectares and consists of a civil enclave of nearly 14 hectares, an increase from its original size of 6 hectares.