Nonstop flight route between Bangalore, India and Aurangabad, Maharashtra, India:
Departure Airport:
Arrival Airport:
Distance from BLR to IXU:
Share this route:
Jump to:
- About this route
- BLR Airport Information
- IXU Airport Information
- Facts about BLR
- Facts about IXU
- Map of Nearest Airports to BLR
- List of Nearest Airports to BLR
- Map of Furthest Airports from BLR
- List of Furthest Airports from BLR
- Map of Nearest Airports to IXU
- List of Nearest Airports to IXU
- Map of Furthest Airports from IXU
- List of Furthest Airports from IXU
About this route:
A direct, nonstop flight between Kempegowda International Airport (BLR), Bangalore, India and Aurangabad Airport (IXU), Aurangabad, Maharashtra, India would travel a Great Circle distance of 485 miles (or 781 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Kempegowda International Airport and Aurangabad Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | BLR / VOBL |
| Airport Name: | Kempegowda International Airport |
| Location: | Bangalore, India |
| GPS Coordinates: | 13°11'56"N by 77°42'20"E |
| Area Served: | Bangalore |
| Airport Type: | Public |
| Elevation: | 3002 feet (915 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from BLR |
| More Information: | BLR Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | IXU / VAAU |
| Airport Names: |
|
| Location: | Aurangabad, Maharashtra, India |
| GPS Coordinates: | 19°51'46"N by 75°23'53"E |
| Operator/Owner: | Airports Authority of India |
| Airport Type: | Public |
| Elevation: | 1911 feet (582 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from IXU |
| More Information: | IXU Maps & Info |
Facts about Kempegowda International Airport (BLR):
- Kempegowda International Airport handled about 12.6 million passengers and had air traffic movements of about 330 per day in 2011.
- Kempegowda International Airport was expected to be inaugurated on 30 March 2008, but due to delays in air traffic control services, it was finally inaugurated on 23 May 2008 just before midnight when a Jet Airways flight from Mumbai landed.
- The furthest airport from Kempegowda International Airport (BLR) is Mataveri International Airport (IPC), which is located 11,368 miles (18,294 kilometers) away in Easter Island, Chile.
- The passenger terminal is a single, fully air conditioned, four-level building capable of accommodating international and domestic operations.
- The airport has 38 gates, 20 aero-bridges, including three double arm, and 18 remote bus bays.
- The closest airport to Kempegowda International Airport (BLR) is Mysore Airport (MYQ), which is located 97 miles (157 kilometers) SW of BLR.
- The cargo village was inaugurated on 9 December 2009.
- On 21 January 2011, a new VIP departure and arrival lounge was inaugurated.
- Kempegowda International Airport (BLR) currently has only 1 runway.
Facts about Aurangabad Airport (IXU):
- The furthest airport from Aurangabad Airport (IXU) is Mataveri International Airport (IPC), which is located 11,847 miles (19,066 kilometers) away in Easter Island, Chile.
- In addition to being known as "Aurangabad Airport", another name for IXU is "औरंगाबाद विमानतळ".
- Aurangabad Airport (IXU) currently has only 1 runway.
- The second phase included a new, integrated terminal building and technical complex to handle domestic and international air traffic.
- The closest airport to Aurangabad Airport (IXU) is Ozar Airport (ISK), which is located 98 miles (158 kilometers) W of IXU.
- Late in the decade the government awarded it to JBIC, which planned, financed and implemented the project.
- The airport opened to regular traffic on 3 March 2009.
