Nonstop flight route between Enejit, Marshall Islands and Bangalore, India:
Departure Airport:
Arrival Airport:
Distance from EJT to BLR:
Share this route:
Jump to:
- About this route
- EJT Airport Information
- BLR Airport Information
- Facts about EJT
- Facts about BLR
- Map of Nearest Airports to EJT
- List of Nearest Airports to EJT
- Map of Furthest Airports from EJT
- List of Furthest Airports from EJT
- Map of Nearest Airports to BLR
- List of Nearest Airports to BLR
- Map of Furthest Airports from BLR
- List of Furthest Airports from BLR
About this route:
A direct, nonstop flight between Enejit Airport (EJT), Enejit, Marshall Islands and Kempegowda International Airport (BLR), Bangalore, India would travel a Great Circle distance of 6,409 miles (or 10,315 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Enejit Airport and Kempegowda International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Enejit Airport and Kempegowda International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | EJT / |
| Airport Name: | Enejit Airport |
| Location: | Enejit, Marshall Islands |
| GPS Coordinates: | 6°2'25"N by 171°59'3"E |
| Area Served: | Enejit, Mili Atoll, Marshall Islands |
| Airport Type: | Public |
| View all routes: | Routes from EJT |
| More Information: | EJT Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | BLR / VOBL |
| Airport Name: | Kempegowda International Airport |
| Location: | Bangalore, India |
| GPS Coordinates: | 13°11'56"N by 77°42'20"E |
| Area Served: | Bangalore |
| Airport Type: | Public |
| Elevation: | 3002 feet (915 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from BLR |
| More Information: | BLR Maps & Info |
Facts about Enejit Airport (EJT):
- The closest airport to Enejit Airport (EJT) is Mili Airport (MIJ), which is located only 18 miles (28 kilometers) W of EJT.
- The furthest airport from Enejit Airport (EJT) is RAF Ascension (ASI), which is located 11,980 miles (19,279 kilometers) away in Georgetown, Ascension Island, Saint Helena.
Facts about Kempegowda International Airport (BLR):
- A plan is being processed for a direct rail service from Bangalore Cantonment Railway Station to the Basement Rail terminal at the airport.
- Kempegowda International Airport was expected to be inaugurated on 30 March 2008, but due to delays in air traffic control services, it was finally inaugurated on 23 May 2008 just before midnight when a Jet Airways flight from Mumbai landed.
- The furthest airport from Kempegowda International Airport (BLR) is Mataveri International Airport (IPC), which is located 11,368 miles (18,294 kilometers) away in Easter Island, Chile.
- The total floor area is approximately 170,000 m2.
- The closest airport to Kempegowda International Airport (BLR) is Mysore Airport (MYQ), which is located 97 miles (157 kilometers) SW of BLR.
- Kempegowda International Airport (BLR) currently has only 1 runway.
- The cargo village was inaugurated on 9 December 2009.
- In the first phase of development, a car park for 2,000 vehicles in front of the terminal building at the ground level has been developed for the convenience of passengers and visitors.
- BIAL is a Public Limited Company under the Companies Act formed to build, own and operate Kempegowda International Airport.
- In January 2012, BIAL announced that the airport would remain fully closed to all flight operations from 11 March until 3 April 2012 between 10:30 and 17:30 IST during which the top layer of its only runway was completely replaced.
