Nonstop flight route between Franceville / Mvengue, Gabon and Hyderabad, India:
Departure Airport:

Arrival Airport:

Distance from MVB to HYD:
Share this route:
Jump to:
- About this route
- MVB Airport Information
- HYD Airport Information
- Facts about MVB
- Facts about HYD
- Map of Nearest Airports to MVB
- List of Nearest Airports to MVB
- Map of Furthest Airports from MVB
- List of Furthest Airports from MVB
- Map of Nearest Airports to HYD
- List of Nearest Airports to HYD
- Map of Furthest Airports from HYD
- List of Furthest Airports from HYD
About this route:
A direct, nonstop flight between M'Vengue El Hadj Omar Bongo Ondimba International Airport (MVB), Franceville / Mvengue, Gabon and Rajiv Gandhi International Airport (HYD), Hyderabad, India would travel a Great Circle distance of 4,611 miles (or 7,420 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between M'Vengue El Hadj Omar Bongo Ondimba International Airport and Rajiv Gandhi International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between M'Vengue El Hadj Omar Bongo Ondimba International Airport and Rajiv Gandhi International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | MVB / FOON |
Airport Name: | M'Vengue El Hadj Omar Bongo Ondimba International Airport |
Location: | Franceville / Mvengue, Gabon |
GPS Coordinates: | 1°39'21"S by 13°26'17"E |
Area Served: | Franceville |
Airport Type: | Civil/Military |
Elevation: | 1450 feet (442 meters) |
# of Runways: | 1 |
View all routes: | Routes from MVB |
More Information: | MVB Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | HYD / VOHS |
Airport Name: | Rajiv Gandhi International Airport |
Location: | Hyderabad, India |
GPS Coordinates: | 17°14'23"N by 78°25'41"E |
Area Served: | Hyderabad |
Operator/Owner: | Airports Authority of India |
Airport Type: | Public |
Elevation: | 2024 feet (617 meters) |
# of Runways: | 2 |
View all routes: | Routes from HYD |
More Information: | HYD Maps & Info |
Facts about M'Vengue El Hadj Omar Bongo Ondimba International Airport (MVB):
- The closest airport to M'Vengue El Hadj Omar Bongo Ondimba International Airport (MVB) is Moanda Airport (MFF), which is located only 14 miles (23 kilometers) NW of MVB.
- The furthest airport from M'Vengue El Hadj Omar Bongo Ondimba International Airport (MVB) is Canton Island Airport (CIS), which is located 11,968 miles (19,261 kilometers) away in Canton Island, Kiribati.
- M'Vengue El Hadj Omar Bongo Ondimba International Airport (MVB) currently has only 1 runway.
Facts about Rajiv Gandhi International Airport (HYD):
- GMR Hyderabad International Airport Ltd signed an MoU with Sabena Flight Academy to establish an Aviation Academy at the new airport.
- Rajiv Gandhi International Airport (HYD) has 2 runways.
- The furthest airport from Rajiv Gandhi International Airport (HYD) is Mataveri International Airport (IPC), which is located 11,587 miles (18,648 kilometers) away in Easter Island, Chile.
- The closest airport to Rajiv Gandhi International Airport (HYD) is Begumpet Airport (BPM), which is located only 15 miles (24 kilometers) N of HYD.
- The airport is 40 km from Secunderabad Junction.
- The Novotel Hyderabad Airport Hotel was opened in October 2008 with 305 rooms and suites, featuring WiFi, executive amenities, restaurants, two bars, pool and meeting rooms.
- In the second phase of the airport development, Terminal 1 will be expanded to an area of 260,000 m2 to cater to the growing demand.
- In the first phase of development, the 105,300 m2 Terminal 1, with the capacity to handle 14 million passengers per annum has been constructed.