Nonstop flight route between Taloqan, Afghanistan and Amman, Jordan:
Departure Airport:
Arrival Airport:
Distance from TQN to AMM:
Share this route:
Jump to:
- About this route
- TQN Airport Information
- AMM Airport Information
- Facts about TQN
- Facts about AMM
- Map of Nearest Airports to TQN
- List of Nearest Airports to TQN
- Map of Furthest Airports from TQN
- List of Furthest Airports from TQN
- Map of Nearest Airports to AMM
- List of Nearest Airports to AMM
- Map of Furthest Airports from AMM
- List of Furthest Airports from AMM
About this route:
A direct, nonstop flight between Taloqan Airport (TQN), Taloqan, Afghanistan and Queen Alia International Airport (AMM), Amman, Jordan would travel a Great Circle distance of 1,937 miles (or 3,117 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Taloqan Airport and Queen Alia International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | TQN / OATQ |
| Airport Names: |
|
| Location: | Taloqan, Afghanistan |
| GPS Coordinates: | 36°46'14"N by 69°31'56"E |
| Area Served: | Taloqan, Takhar Province |
| Operator/Owner: | Afghanistan |
| Airport Type: | Public/Military |
| Elevation: | 2677 feet (816 meters) |
| View all routes: | Routes from TQN |
| More Information: | TQN Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | AMM / OJAI |
| Airport Names: |
|
| Location: | Amman, Jordan |
| GPS Coordinates: | 31°43'21"N by 35°59'35"E |
| Area Served: | Amman |
| Operator/Owner: | AIG group & Government of Jordan |
| Airport Type: | Public |
| Elevation: | 2395 feet (730 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from AMM |
| More Information: | AMM Maps & Info |
Facts about Taloqan Airport (TQN):
- The closest airport to Taloqan Airport (TQN) is Kunduz Airport (UND), which is located 35 miles (57 kilometers) WSW of TQN.
- In addition to being known as "Taloqan Airport", other names for TQN include "Taluqan Airport (Taluqan)" and "KDH".
- The furthest airport from Taloqan Airport (TQN) is Mataveri International Airport (IPC), which is located 11,770 miles (18,942 kilometers) away in Easter Island, Chile.
Facts about Queen Alia International Airport (AMM):
- In June 2013, QAIA became the second airport in the Middle East to achieve the "Mapping" level of the Airport Carbon Accreditation program run by Airports Council International Europe.
- In addition to being known as "Queen Alia International Airport", other names for AMM include "مطار الملكة علياء الدولي" and "Matar al-Malikah 'Alya' ad-Dowaly".
- The new terminal is also equipped to accommodate rising annual passenger traffic, taking the original airport capacity from 3.5 million passengers per year to 7 million.
- A state-of-the-art new terminal was inaugurated in March 2013 to replace the airport's older two passenger terminals and one cargo terminal.
- The furthest airport from Queen Alia International Airport (AMM) is Rurutu Airport (RUR), which is located 11,652 miles (18,752 kilometers) away in Rurutu, French Polynesia.
- Retail space was expanded by 25% at the new terminal, covering more than 6,000 square metres.
- Queen Alia International Airport (AMM) has 2 runways.
- The closest airport to Queen Alia International Airport (AMM) is Amman Civil Airport (ADJ), which is located only 17 miles (28 kilometers) N of AMM.
- Queen Alia International Airport handled 650,200 passengers last year.
- QAIA's new design was created by architects Foster + Partners.
- Through the BOT Public-Private Partnership framework, the Government retains ownership of the airport and receives 54.47% of the airport's gross revenues for the first six years, and 54.64% of the gross revenues for the remaining 19 years of the agreement's 25-year term.
- Accordingly, AIG invested an estimated USD 750 million in the construction of the new terminal.
