Nonstop flight route between Taloqan, Afghanistan and Bangalore, India:
Departure Airport:
Arrival Airport:
Distance from TQN to BLR:
Share this route:
Jump to:
- About this route
- TQN Airport Information
- BLR Airport Information
- Facts about TQN
- Facts about BLR
- Map of Nearest Airports to TQN
- List of Nearest Airports to TQN
- Map of Furthest Airports from TQN
- List of Furthest Airports from TQN
- Map of Nearest Airports to BLR
- List of Nearest Airports to BLR
- Map of Furthest Airports from BLR
- List of Furthest Airports from BLR
About this route:
A direct, nonstop flight between Taloqan Airport (TQN), Taloqan, Afghanistan and Kempegowda International Airport (BLR), Bangalore, India would travel a Great Circle distance of 1,705 miles (or 2,745 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Taloqan Airport and Kempegowda International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | TQN / OATQ |
| Airport Names: |
|
| Location: | Taloqan, Afghanistan |
| GPS Coordinates: | 36°46'14"N by 69°31'56"E |
| Area Served: | Taloqan, Takhar Province |
| Operator/Owner: | Afghanistan |
| Airport Type: | Public/Military |
| Elevation: | 2677 feet (816 meters) |
| View all routes: | Routes from TQN |
| More Information: | TQN Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | BLR / VOBL |
| Airport Name: | Kempegowda International Airport |
| Location: | Bangalore, India |
| GPS Coordinates: | 13°11'56"N by 77°42'20"E |
| Area Served: | Bangalore |
| Airport Type: | Public |
| Elevation: | 3002 feet (915 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from BLR |
| More Information: | BLR Maps & Info |
Facts about Taloqan Airport (TQN):
- In addition to being known as "Taloqan Airport", other names for TQN include "Taluqan Airport (Taluqan)" and "KDH".
- The closest airport to Taloqan Airport (TQN) is Kunduz Airport (UND), which is located 35 miles (57 kilometers) WSW of TQN.
- The furthest airport from Taloqan Airport (TQN) is Mataveri International Airport (IPC), which is located 11,770 miles (18,942 kilometers) away in Easter Island, Chile.
Facts about Kempegowda International Airport (BLR):
- Kempegowda International Airport was expected to be inaugurated on 30 March 2008, but due to delays in air traffic control services, it was finally inaugurated on 23 May 2008 just before midnight when a Jet Airways flight from Mumbai landed.
- The airport was later expanded in 2012, to provide for more passengers and aircraft.
- The furthest airport from Kempegowda International Airport (BLR) is Mataveri International Airport (IPC), which is located 11,368 miles (18,294 kilometers) away in Easter Island, Chile.
- In the first phase of development, a car park for 2,000 vehicles in front of the terminal building at the ground level has been developed for the convenience of passengers and visitors.
- The closest airport to Kempegowda International Airport (BLR) is Mysore Airport (MYQ), which is located 97 miles (157 kilometers) SW of BLR.
- Auto rickshaws are not allowed beyond the trumpet interchange leading to the airport, but passengers can get dropped off at the trumpet interchange by an auto rickshaw and then use an airport shuttle bus from the interchange.
- Kempegowda International Airport (BLR) currently has only 1 runway.
- In January 2012, BIAL announced that the airport would remain fully closed to all flight operations from 11 March until 3 April 2012 between 10:30 and 17:30 IST during which the top layer of its only runway was completely replaced.
- On 19 January 2010, BIAL embarked on an expansion plan and fast tracked extension of the current terminal, which includes new architectural components.
