Nonstop flight route between Château-Thierry, France and Al Najaf, Iraq:
Departure Airport:

Arrival Airport:

Distance from XCY to NJF:
Share this route:
Jump to:
- About this route
- XCY Airport Information
- NJF Airport Information
- Facts about XCY
- Facts about NJF
- Map of Nearest Airports to XCY
- List of Nearest Airports to XCY
- Map of Furthest Airports from XCY
- List of Furthest Airports from XCY
- Map of Nearest Airports to NJF
- List of Nearest Airports to NJF
- Map of Furthest Airports from NJF
- List of Furthest Airports from NJF
About this route:
A direct, nonstop flight between Château-Thierry - Belleau Aerodrome (XCY), Château-Thierry, France and Al Najaf International Airport (NJF), Al Najaf, Iraq would travel a Great Circle distance of 2,417 miles (or 3,890 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Château-Thierry - Belleau Aerodrome and Al Najaf International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
IATA / ICAO Codes: | XCY / LFFH |
Airport Names: |
|
Location: | Château-Thierry, France |
GPS Coordinates: | 49°4'0"N by 3°21'20"E |
Area Served: | Château-Thierry, France |
Operator/Owner: | Club aéronautique de Château Thierry |
Airport Type: | Public |
Elevation: | 723 feet (220 meters) |
# of Runways: | 1 |
View all routes: | Routes from XCY |
More Information: | XCY Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | NJF / ORNI |
Airport Name: | Al Najaf International Airport |
Location: | Al Najaf, Iraq |
GPS Coordinates: | 31°59'23"N by 44°24'15"E |
Area Served: | Najaf, Iraq |
Operator/Owner: | Najaf Airport Authority |
Airport Type: | Public |
# of Runways: | 1 |
View all routes: | Routes from NJF |
More Information: | NJF Maps & Info |
Facts about Château-Thierry - Belleau Aerodrome (XCY):
- The furthest airport from Château-Thierry - Belleau Aerodrome (XCY) is Chatham Islands (CHT), which is nearly antipodal to Château-Thierry - Belleau Aerodrome (meaning Château-Thierry - Belleau Aerodrome is almost on the exact opposite side of the Earth from Chatham Islands), and is located 12,073 miles (19,430 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- Château-Thierry - Belleau Aerodrome (XCY) currently has only 1 runway.
- Because of Château-Thierry - Belleau Aerodrome's relatively low elevation of 723 feet, planes can take off or land at Château-Thierry - Belleau Aerodrome at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The closest airport to Château-Thierry - Belleau Aerodrome (XCY) is Reims-Champagne Air Base (RHE), which is located 36 miles (57 kilometers) ENE of XCY.
- In addition to being known as "Château-Thierry - Belleau Aerodrome", another name for XCY is "Aérodrome de Château-Thierry - Belleau".
Facts about Al Najaf International Airport (NJF):
- The furthest airport from Al Najaf International Airport (NJF) is Totegegie Airport (GMR), which is located 11,820 miles (19,022 kilometers) away in Mangareva, Gambier Islands, French Polynesia.
- Al Najaf International Airport (NJF) currently has only 1 runway.
- The closest airport to Al Najaf International Airport (NJF) is Baghdad International Airport (BGW), which is located 88 miles (142 kilometers) N of NJF.
- The Najaf Governorate represented by the Deputy Governor Abd al-Husayn Abtan and Najaf Investment Commission signed a Memorandum of Agreement dated 24 June 2008 with Al-Aqeelah Holding authorizing it for one year to finalize the construction of the airport and five years subject to renewal to manage the airport.