Nonstop flight route between Kampong Chhnang, Kampong Chhnang Province, Cambodia and Bangalore, India:
Departure Airport:
Arrival Airport:
Distance from KZC to BLR:
Share this route:
Jump to:
- About this route
- KZC Airport Information
- BLR Airport Information
- Facts about KZC
- Facts about BLR
- Map of Nearest Airports to KZC
- List of Nearest Airports to KZC
- Map of Furthest Airports from KZC
- List of Furthest Airports from KZC
- Map of Nearest Airports to BLR
- List of Nearest Airports to BLR
- Map of Furthest Airports from BLR
- List of Furthest Airports from BLR
About this route:
A direct, nonstop flight between Kampong Chhnang Airport (KZC), Kampong Chhnang, Kampong Chhnang Province, Cambodia and Kempegowda International Airport (BLR), Bangalore, India would travel a Great Circle distance of 1,810 miles (or 2,914 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Kampong Chhnang Airport and Kempegowda International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | KZC / VDKH |
| Airport Name: | Kampong Chhnang Airport |
| Location: | Kampong Chhnang, Kampong Chhnang Province, Cambodia |
| GPS Coordinates: | 12°15'18"N by 104°33'48"E |
| Area Served: | Kompong Chhnang, Cambodia |
| Operator/Owner: | Government |
| Airport Type: | Public |
| Elevation: | 56 feet (17 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from KZC |
| More Information: | KZC Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | BLR / VOBL |
| Airport Name: | Kempegowda International Airport |
| Location: | Bangalore, India |
| GPS Coordinates: | 13°11'56"N by 77°42'20"E |
| Area Served: | Bangalore |
| Airport Type: | Public |
| Elevation: | 3002 feet (915 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from BLR |
| More Information: | BLR Maps & Info |
Facts about Kampong Chhnang Airport (KZC):
- The closest airport to Kampong Chhnang Airport (KZC) is Krakor Airport (KZD), which is located 34 miles (55 kilometers) NW of KZC.
- Because of Kampong Chhnang Airport's relatively low elevation of 56 feet, planes can take off or land at Kampong Chhnang Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Kampong Chhnang Airport (KZC) currently has only 1 runway.
- The furthest airport from Kampong Chhnang Airport (KZC) is Jauja AirportFrancisco Carle Airport (JAU), which is nearly antipodal to Kampong Chhnang Airport (meaning Kampong Chhnang Airport is almost on the exact opposite side of the Earth from Jauja AirportFrancisco Carle Airport), and is located 12,404 miles (19,962 kilometers) away in Jauja, Peru.
Facts about Kempegowda International Airport (BLR):
- The cargo village was inaugurated on 9 December 2009.
- The closest airport to Kempegowda International Airport (BLR) is Mysore Airport (MYQ), which is located 97 miles (157 kilometers) SW of BLR.
- Kempegowda International Airport (BLR) currently has only 1 runway.
- The airport can handle 20 million people per annum with 35 aircraft movements per hour and an estimated 576 movements.
- The airport project started as a public-private joint venture between Germany's Siemens Project Ventures GmbH, Government of Karnataka and Airports Authority of India.
- The furthest airport from Kempegowda International Airport (BLR) is Mataveri International Airport (IPC), which is located 11,368 miles (18,294 kilometers) away in Easter Island, Chile.
- In January 2012, BIAL announced that the airport would remain fully closed to all flight operations from 11 March until 3 April 2012 between 10:30 and 17:30 IST during which the top layer of its only runway was completely replaced.
