Nonstop flight route between Columbia/Mount Pleasant, Tennessee, United States and Hyderabad, India:
Departure Airport:
Arrival Airport:
Distance from MRC to HYD:
Share this route:
Jump to:
- About this route
- MRC Airport Information
- HYD Airport Information
- Facts about MRC
- Facts about HYD
- Map of Nearest Airports to MRC
- List of Nearest Airports to MRC
- Map of Furthest Airports from MRC
- List of Furthest Airports from MRC
- Map of Nearest Airports to HYD
- List of Nearest Airports to HYD
- Map of Furthest Airports from HYD
- List of Furthest Airports from HYD
About this route:
A direct, nonstop flight between Maury County Airport (MRC), Columbia/Mount Pleasant, Tennessee, United States and Rajiv Gandhi International Airport (HYD), Hyderabad, India would travel a Great Circle distance of 8,669 miles (or 13,952 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Maury County Airport and Rajiv Gandhi International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Maury County Airport and Rajiv Gandhi International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | MRC / KMRC |
Airport Name: | Maury County Airport |
Location: | Columbia/Mount Pleasant, Tennessee, United States |
GPS Coordinates: | 35°33'15"N by 87°10'45"W |
Area Served: | Columbia / Mount Pleasant, Tennessee |
Operator/Owner: | Maury County Regional Airport Authority |
Airport Type: | Public |
Elevation: | 681 feet (208 meters) |
# of Runways: | 2 |
View all routes: | Routes from MRC |
More Information: | MRC Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | HYD / VOHS |
Airport Name: | Rajiv Gandhi International Airport |
Location: | Hyderabad, India |
GPS Coordinates: | 17°14'23"N by 78°25'41"E |
Area Served: | Hyderabad |
Operator/Owner: | Airports Authority of India |
Airport Type: | Public |
Elevation: | 2024 feet (617 meters) |
# of Runways: | 2 |
View all routes: | Routes from HYD |
More Information: | HYD Maps & Info |
Facts about Maury County Airport (MRC):
- This airport is included in the National Plan of Integrated Airport Systems for 2011–2015, which categorized it as a general aviation airport.
- Because of Maury County Airport's relatively low elevation of 681 feet, planes can take off or land at Maury County Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The furthest airport from Maury County Airport (MRC) is Margaret River Airport (MGV), which is located 11,170 miles (17,976 kilometers) away in Margaret River, Western Australia, Australia.
- Maury County Airport covers an area of 188 acres at an elevation of 681 feet above mean sea level.
- Maury County Airport (MRC) has 2 runways.
- The closest airport to Maury County Airport (MRC) is Centerville Municipal Airport (GHM), which is located 25 miles (40 kilometers) NW of MRC.
Facts about Rajiv Gandhi International Airport (HYD):
- GMR Hyderabad International Airport Ltd.
- The closest airport to Rajiv Gandhi International Airport (HYD) is Begumpet Airport (BPM), which is located only 15 miles (24 kilometers) N of HYD.
- Rajiv Gandhi International Airport (HYD) has 2 runways.
- The furthest airport from Rajiv Gandhi International Airport (HYD) is Mataveri International Airport (IPC), which is located 11,587 miles (18,648 kilometers) away in Easter Island, Chile.
- The airport will reach its full maturity after the third phase.
- In the first phase of development, the 105,300 m2 Terminal 1, with the capacity to handle 14 million passengers per annum has been constructed.