Nonstop flight route between Omaha, Nebraska, United States and Tbilisi, Georgia:
Departure Airport:
Arrival Airport:
Distance from OFF to TBS:
Share this route:
Jump to:
- About this route
- OFF Airport Information
- TBS Airport Information
- Facts about OFF
- Facts about TBS
- Map of Nearest Airports to OFF
- List of Nearest Airports to OFF
- Map of Furthest Airports from OFF
- List of Furthest Airports from OFF
- Map of Nearest Airports to TBS
- List of Nearest Airports to TBS
- Map of Furthest Airports from TBS
- List of Furthest Airports from TBS
About this route:
A direct, nonstop flight between Offutt Air Force Base (OFF), Omaha, Nebraska, United States and Tbilisi Airport (TBS), Tbilisi, Georgia would travel a Great Circle distance of 6,216 miles (or 10,003 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Offutt Air Force Base and Tbilisi Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Offutt Air Force Base and Tbilisi Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | OFF / KOFF |
| Airport Names: |
|
| Location: | Omaha, Nebraska, United States |
| GPS Coordinates: | 41°7'9"N by 95°54'30"W |
| View all routes: | Routes from OFF |
| More Information: | OFF Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | TBS / UGTB |
| Airport Names: |
|
| Location: | Tbilisi, Georgia |
| GPS Coordinates: | 41°40'9"N by 44°57'16"E |
| Area Served: | Tbilisi |
| Operator/Owner: | United Airports of Georgia LLC |
| Airport Type: | Public |
| Elevation: | 1624 feet (495 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from TBS |
| More Information: | TBS Maps & Info |
Facts about Offutt Air Force Base (OFF):
- In addition to being known as "Offutt Air Force Base", another name for OFF is "Offutt AFB".
- It is charged with space operations, information operations, missile defense, global command and control, intelligence, surveillance, and reconnaissance, global strike and strategic deterrence, and combating weapons of mass destruction.
- The newly established United States Air Force took control of the facility in September 1947, and on 13 January 1948 it was renamed Offutt Air Force Base.
- On 6 May 1924, the airfield was officially named "Offutt Field".
- The closest airport to Offutt Air Force Base (OFF) is Millard Airport (MIQ), which is located only 12 miles (19 kilometers) WNW of OFF.
- Offutt's great heritage began with the commissioning by the War Department in 1890 of Fort Crook.
- Offutt again faced monumental changes in 1992 when the easing of world tensions allowed the United States to reorganize its Air Force.
- The furthest airport from Offutt Air Force Base (OFF) is Margaret River Airport (MGV), which is located 10,677 miles (17,183 kilometers) away in Margaret River, Western Australia, Australia.
Facts about Tbilisi Airport (TBS):
- In addition to being known as "Tbilisi Airport", another name for TBS is "თბილისის საერთაშორისო აეროპორტი".
- The closest airport to Tbilisi Airport (TBS) is Shirak International Airport (LWN), which is located 85 miles (137 kilometers) SW of TBS.
- Tbilisi airport mainly serves destinations in CIS, Europe and Middle East.
- Tbilisi Airport (TBS) has 2 runways.
- The total project cost was 90.5 million USD.
- The furthest airport from Tbilisi Airport (TBS) is Totegegie Airport (GMR), which is located 11,153 miles (17,948 kilometers) away in Mangareva, Gambier Islands, French Polynesia.
- “It has been planned to get the investment on reconstruction of the runway started in September 2012 and complete the project in less than 2 years,” the company said.
