Nonstop flight route between Tbilisi, Georgia and Lucknow, India:
Departure Airport:
Arrival Airport:
Distance from TBS to LKO:
Share this route:
Jump to:
- About this route
- TBS Airport Information
- LKO Airport Information
- Facts about TBS
- Facts about LKO
- Map of Nearest Airports to TBS
- List of Nearest Airports to TBS
- Map of Furthest Airports from TBS
- List of Furthest Airports from TBS
- Map of Nearest Airports to LKO
- List of Nearest Airports to LKO
- Map of Furthest Airports from LKO
- List of Furthest Airports from LKO
About this route:
A direct, nonstop flight between Tbilisi Airport (TBS), Tbilisi, Georgia and Chaudhary Charan Singh International Airport (LKO), Lucknow, India would travel a Great Circle distance of 2,274 miles (or 3,660 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Tbilisi Airport and Chaudhary Charan Singh International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | TBS / UGTB |
| Airport Names: |
|
| Location: | Tbilisi, Georgia |
| GPS Coordinates: | 41°40'9"N by 44°57'16"E |
| Area Served: | Tbilisi |
| Operator/Owner: | United Airports of Georgia LLC |
| Airport Type: | Public |
| Elevation: | 1624 feet (495 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from TBS |
| More Information: | TBS Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | LKO / VILK |
| Airport Name: | Chaudhary Charan Singh International Airport |
| Location: | Lucknow, India |
| GPS Coordinates: | 26°45'42"N by 80°52'59"E |
| Area Served: | Lucknow |
| Operator/Owner: | Airports Authority of India |
| Airport Type: | Public |
| Elevation: | 404 feet (123 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from LKO |
| More Information: | LKO Maps & Info |
Facts about Tbilisi Airport (TBS):
- Tbilisi Airport (TBS) has 2 runways.
- The closest airport to Tbilisi Airport (TBS) is Shirak International Airport (LWN), which is located 85 miles (137 kilometers) SW of TBS.
- “It has been planned to get the investment on reconstruction of the runway started in September 2012 and complete the project in less than 2 years,” the company said.
- The furthest airport from Tbilisi Airport (TBS) is Totegegie Airport (GMR), which is located 11,153 miles (17,948 kilometers) away in Mangareva, Gambier Islands, French Polynesia.
- In addition to being known as "Tbilisi Airport", another name for TBS is "თბილისის საერთაშორისო აეროპორტი".
- The implementing agency and the borrower for the project is TAV Urban Georgia, a concessionaire and special purpose vehicle for the construction and operation of the airport.
Facts about Chaudhary Charan Singh International Airport (LKO):
- Because of Chaudhary Charan Singh International Airport's relatively low elevation of 404 feet, planes can take off or land at Chaudhary Charan Singh International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The closest airport to Chaudhary Charan Singh International Airport (LKO) is Kanpur Airport कानपुर हवाई अड्डा کان پور ہوائی اڈا (KNU), which is located 38 miles (62 kilometers) SW of LKO.
- The furthest airport from Chaudhary Charan Singh International Airport (LKO) is Mataveri International Airport (IPC), which is located 11,802 miles (18,993 kilometers) away in Easter Island, Chile.
- Chaudhary Charan Singh International Airport (LKO) currently has only 1 runway.
- The airport has two terminals, the second integrated terminal was completed in April 2012.
