Nonstop flight route between Altay, Xinjiang, China and Kingston, Jamaica:
Departure Airport:
Arrival Airport:
Distance from AAT to KIN:
Share this route:
Jump to:
- About this route
- AAT Airport Information
- KIN Airport Information
- Facts about AAT
- Facts about KIN
- Map of Nearest Airports to AAT
- List of Nearest Airports to AAT
- Map of Furthest Airports from AAT
- List of Furthest Airports from AAT
- Map of Nearest Airports to KIN
- List of Nearest Airports to KIN
- Map of Furthest Airports from KIN
- List of Furthest Airports from KIN
About this route:
A direct, nonstop flight between Altay Airport (AAT), Altay, Xinjiang, China and Norman Manley International Airport (KIN), Kingston, Jamaica would travel a Great Circle distance of 7,803 miles (or 12,557 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Altay Airport and Norman Manley International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Altay Airport and Norman Manley International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | AAT / ZWAT |
Airport Names: |
|
Location: | Altay, Xinjiang, China |
GPS Coordinates: | 47°45'1"N by 88°5'3"E |
Area Served: | Altay, Xinjiang, People's Republic of China |
Operator/Owner: | Civil Aviation Administration of China |
Airport Type: | Public |
Elevation: | 2460 feet (750 meters) |
# of Runways: | 1 |
View all routes: | Routes from AAT |
More Information: | AAT Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | KIN / MKJP |
Airport Name: | Norman Manley International Airport |
Location: | Kingston, Jamaica |
GPS Coordinates: | 17°56'8"N by 76°47'14"W |
Area Served: | Kingston, Jamaica |
Operator/Owner: | NMIA Airports Limited |
Airport Type: | Public |
Elevation: | 10 feet (3 meters) |
# of Runways: | 1 |
View all routes: | Routes from KIN |
More Information: | KIN Maps & Info |
Facts about Altay Airport (AAT):
- The furthest airport from Altay Airport (AAT) is Cochrane Airfield (LGR), which is located 11,536 miles (18,566 kilometers) away in Cochrane, Chile.
- Altay Airport (AAT) currently has only 1 runway.
- In addition to being known as "Altay Airport", other names for AAT include "阿勒泰机场" and "Ālètài Jīchǎng".
- The closest airport to Altay Airport (AAT) is Kanas Airport (KJI), which is located 60 miles (96 kilometers) WNW of AAT.
Facts about Norman Manley International Airport (KIN):
- The furthest airport from Norman Manley International Airport (KIN) is Christmas Island Airport (XCH), which is located 11,894 miles (19,141 kilometers) away in Christmas Island, Australia.
- Because of Norman Manley International Airport's relatively low elevation of 10 feet, planes can take off or land at Norman Manley International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The contract relating to additions and alterations to the departure concourse has been awarded to Kier Construction Limited and is valued at $161.5M.
- The closest airport to Norman Manley International Airport (KIN) is Tinson Pen Aerodrome (KTP), which is located only 4 miles (7 kilometers) NNW of KIN.
- Norman Manley International Airport handled 1,714,710 passengers last year.
- Phase 2, which is the final phase of the project, is to commence in 2013 and end in 2022.
- Norman Manley International Airport (KIN) currently has only 1 runway.
- "The first phase of construction and renovation should be complete by 2007."Construction started in June 2006.