Nonstop flight route between Burao, Somalia and Bangalore, India:
Departure Airport:

Arrival Airport:

Distance from BUO to BLR:
Share this route:
Jump to:
- About this route
- BUO Airport Information
- BLR Airport Information
- Facts about BUO
- Facts about BLR
- Map of Nearest Airports to BUO
- List of Nearest Airports to BUO
- Map of Furthest Airports from BUO
- List of Furthest Airports from BUO
- Map of Nearest Airports to BLR
- List of Nearest Airports to BLR
- Map of Furthest Airports from BLR
- List of Furthest Airports from BLR
About this route:
A direct, nonstop flight between Burao Airport (BUO), Burao, Somalia and Kempegowda International Airport (BLR), Bangalore, India would travel a Great Circle distance of 2,190 miles (or 3,525 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Burao Airport and Kempegowda International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
IATA / ICAO Codes: | BUO / HCMV |
Airport Name: | Burao Airport |
Location: | Burao, Somalia |
GPS Coordinates: | 9°31'0"N by 45°34'0"E |
Area Served: | Burao, Somalia |
Elevation: | 3400 feet (1,036 meters) |
# of Runways: | 1 |
View all routes: | Routes from BUO |
More Information: | BUO Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | BLR / VOBL |
Airport Name: | Kempegowda International Airport |
Location: | Bangalore, India |
GPS Coordinates: | 13°11'56"N by 77°42'20"E |
Area Served: | Bangalore |
Airport Type: | Public |
Elevation: | 3002 feet (915 meters) |
# of Runways: | 1 |
View all routes: | Routes from BLR |
More Information: | BLR Maps & Info |
Facts about Burao Airport (BUO):
- The closest airport to Burao Airport (BUO) is Berbera Airport (BBO), which is located 74 miles (119 kilometers) NW of BUO.
- The furthest airport from Burao Airport (BUO) is Atuona Airport (AUQ), which is nearly antipodal to Burao Airport (meaning Burao Airport is almost on the exact opposite side of the Earth from Atuona Airport), and is located 12,124 miles (19,512 kilometers) away in Atuona, Marquesas Islands, French Polynesia.
- Burao Airport (BUO) currently has only 1 runway.
Facts about Kempegowda International Airport (BLR):
- The airport was later expanded in 2012, to provide for more passengers and aircraft.
- Kempegowda International Airport (BLR) currently has only 1 runway.
- A plan is being processed for a direct rail service from Bangalore Cantonment Railway Station to the Basement Rail terminal at the airport.
- On 19 January 2010, BIAL embarked on an expansion plan and fast tracked extension of the current terminal, which includes new architectural components.
- Shuttle service provided by the Bangalore Metropolitan Transport Corporation, connects parts of the city to the airport.
- In the first phase of development, a car park for 2,000 vehicles in front of the terminal building at the ground level has been developed for the convenience of passengers and visitors.
- The furthest airport from Kempegowda International Airport (BLR) is Mataveri International Airport (IPC), which is located 11,368 miles (18,294 kilometers) away in Easter Island, Chile.
- The closest airport to Kempegowda International Airport (BLR) is Mysore Airport (MYQ), which is located 97 miles (157 kilometers) SW of BLR.
- Kempegowda International Airport was expected to be inaugurated on 30 March 2008, but due to delays in air traffic control services, it was finally inaugurated on 23 May 2008 just before midnight when a Jet Airways flight from Mumbai landed.
- In January 2012, BIAL announced that the airport would remain fully closed to all flight operations from 11 March until 3 April 2012 between 10:30 and 17:30 IST during which the top layer of its only runway was completely replaced.