Nonstop flight route between Cabatuan / Santa Barbara, Iloilo, Philippines and Allentown, Pennsylvania, United States:
Departure Airport:
Arrival Airport:
Distance from ILO to ABE:
Share this route:
Jump to:
- About this route
- ILO Airport Information
- ABE Airport Information
- Facts about ILO
- Facts about ABE
- Map of Nearest Airports to ILO
- List of Nearest Airports to ILO
- Map of Furthest Airports from ILO
- List of Furthest Airports from ILO
- Map of Nearest Airports to ABE
- List of Nearest Airports to ABE
- Map of Furthest Airports from ABE
- List of Furthest Airports from ABE
About this route:
A direct, nonstop flight between Iloilo International Airport (Cabatuan Airport) (ILO), Cabatuan / Santa Barbara, Iloilo, Philippines and Lehigh Valley International Airport (ABE), Allentown, Pennsylvania, United States would travel a Great Circle distance of 8,700 miles (or 14,001 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Iloilo International Airport (Cabatuan Airport) and Lehigh Valley International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Iloilo International Airport (Cabatuan Airport) and Lehigh Valley International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | ILO / RPVI |
| Airport Names: |
|
| Location: | Cabatuan / Santa Barbara, Iloilo, Philippines |
| GPS Coordinates: | 10°49'56"N by 122°29'35"E |
| Area Served: | Iloilo |
| Operator/Owner: | Civil Aviation Authority of the Philippines |
| Airport Type: | Public |
| Elevation: | 168 feet (51 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from ILO |
| More Information: | ILO Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | ABE / KABE |
| Airport Name: | Lehigh Valley International Airport |
| Location: | Allentown, Pennsylvania, United States |
| GPS Coordinates: | 40°39'8"N by 75°26'25"W |
| Area Served: | Lehigh Valley |
| Airport Type: | Public |
| Elevation: | 393 feet (120 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from ABE |
| More Information: | ABE Maps & Info |
Facts about Iloilo International Airport (Cabatuan Airport) (ILO):
- The airport was formally opened on June 13 with the arrival of the presidential aircraft at the new airport at around 9:50 am PST, with Governor Tupas leading provincial and city officials in welcoming the President to the new facility.
- In addition to being known as "Iloilo International Airport (Cabatuan Airport)", another name for ILO is "Paliparang Pandaigdig ng IloiloPangkalibutan nga Hulugpaan sang Iloilo".
- Iloilo International Airport (Cabatuan Airport) (ILO) currently has only 1 runway.
- Beset with a myriad of problems, authorities eventually concluded that a new airport had to be built outside the city, and thus Iloilo International Airport was born.
- More recently, after the opening of the airport, the local government of Cabatuan suggested renaming the airport after Tomas Confesor, a native of Cabatuan who once served as governor of Iloilo, a senator, and is known for being one of the founders of the Boy Scouts of the Philippines.
- The terminal is equipped with six X-ray machines, as well as escalators and staircases for departing and arriving passengers' use.
- The closest airport to Iloilo International Airport (Cabatuan Airport) (ILO) is Bacolod-Silay International Airport (BCD), which is located 36 miles (57 kilometers) E of ILO.
- Because of Iloilo International Airport (Cabatuan Airport)'s relatively low elevation of 168 feet, planes can take off or land at Iloilo International Airport (Cabatuan Airport) at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The furthest airport from Iloilo International Airport (Cabatuan Airport) (ILO) is Inácio Luís do Nascimento Airport (JUA), which is nearly antipodal to Iloilo International Airport (Cabatuan Airport) (meaning Iloilo International Airport (Cabatuan Airport) is almost on the exact opposite side of the Earth from Inácio Luís do Nascimento Airport), and is located 12,405 miles (19,964 kilometers) away in Juara, Mato Grosso, Brazil.
- Iloilo International Airport (Cabatuan Airport) handled 1,707,969 passengers last year.
Facts about Lehigh Valley International Airport (ABE):
- The airport website says in 2012 the airport had 100,048 aircraft operations.
- The furthest airport from Lehigh Valley International Airport (ABE) is Margaret River Airport (MGV), which is located 11,695 miles (18,821 kilometers) away in Margaret River, Western Australia, Australia.
- Naval pilot training graduation ceremony at the Allentown PA Airport – 1943
- A new passenger terminal began construction in 1948 and was finished in 1950.
- Because of Lehigh Valley International Airport's relatively low elevation of 393 feet, planes can take off or land at Lehigh Valley International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Lehigh Valley International Airport (ABE) has 2 runways.
- The airport has had competition from Philadelphia International Airport and Newark Liberty International Airport, which have more flights and sometimes lower fares.
- The closest airport to Lehigh Valley International Airport (ABE) is Quakertown Airport (UKT), which is located only 15 miles (25 kilometers) SSE of ABE.
- Construction began on the present terminal in 1973 and the project, designed by Wallace & Watson, was completed in 1976.
