Nonstop flight route between Cabatuan / Santa Barbara, Iloilo, Philippines and New Richmond, Wisconsin, United States:
Departure Airport:
Arrival Airport:
Distance from ILO to RNH:
Share this route:
Jump to:
- About this route
- ILO Airport Information
- RNH Airport Information
- Facts about ILO
- Facts about RNH
- Map of Nearest Airports to ILO
- List of Nearest Airports to ILO
- Map of Furthest Airports from ILO
- List of Furthest Airports from ILO
- Map of Nearest Airports to RNH
- List of Nearest Airports to RNH
- Map of Furthest Airports from RNH
- List of Furthest Airports from RNH
About this route:
A direct, nonstop flight between Iloilo International Airport (Cabatuan Airport) (ILO), Cabatuan / Santa Barbara, Iloilo, Philippines and New Richmond Regional Airport (RNH), New Richmond, Wisconsin, United States would travel a Great Circle distance of 7,996 miles (or 12,867 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Iloilo International Airport (Cabatuan Airport) and New Richmond Regional Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Iloilo International Airport (Cabatuan Airport) and New Richmond Regional Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | ILO / RPVI |
| Airport Names: |
|
| Location: | Cabatuan / Santa Barbara, Iloilo, Philippines |
| GPS Coordinates: | 10°49'56"N by 122°29'35"E |
| Area Served: | Iloilo |
| Operator/Owner: | Civil Aviation Authority of the Philippines |
| Airport Type: | Public |
| Elevation: | 168 feet (51 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from ILO |
| More Information: | ILO Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | RNH / KRNH |
| Airport Name: | New Richmond Regional Airport |
| Location: | New Richmond, Wisconsin, United States |
| GPS Coordinates: | 45°8'51"N by 92°32'20"W |
| Elevation: | 997 feet (304 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from RNH |
| More Information: | RNH Maps & Info |
Facts about Iloilo International Airport (Cabatuan Airport) (ILO):
- In addition to being known as "Iloilo International Airport (Cabatuan Airport)", another name for ILO is "Paliparang Pandaigdig ng IloiloPangkalibutan nga Hulugpaan sang Iloilo".
- Iloilo International Airport (Cabatuan Airport) (ILO) currently has only 1 runway.
- The furthest airport from Iloilo International Airport (Cabatuan Airport) (ILO) is Inácio Luís do Nascimento Airport (JUA), which is nearly antipodal to Iloilo International Airport (Cabatuan Airport) (meaning Iloilo International Airport (Cabatuan Airport) is almost on the exact opposite side of the Earth from Inácio Luís do Nascimento Airport), and is located 12,405 miles (19,964 kilometers) away in Juara, Mato Grosso, Brazil.
- In addition to problems with the terminal building, both the airport's location and surrounding infrastructure were the subject of much complaint as well.
- Prior to the construction of Iloilo International Airport, Iloilo City was served by the old Iloilo Airport in Mandurriao, Iloilo City, which had been in operation since 1937.
- The Iloilo International Airport project was inaugurated by President Gloria Macapagal-Arroyo on January 25, 2004, and construction work on the new airport started on April 14 that year.
- The airport was formally opened on June 13 with the arrival of the presidential aircraft at the new airport at around 9:50 am PST, with Governor Tupas leading provincial and city officials in welcoming the President to the new facility.
- Because of Iloilo International Airport (Cabatuan Airport)'s relatively low elevation of 168 feet, planes can take off or land at Iloilo International Airport (Cabatuan Airport) at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Iloilo International Airport currently services an average of 42 flights daily on four domestic routes.
- Iloilo International Airport (Cabatuan Airport) handled 1,707,969 passengers last year.
- The closest airport to Iloilo International Airport (Cabatuan Airport) (ILO) is Bacolod-Silay International Airport (BCD), which is located 36 miles (57 kilometers) E of ILO.
- The airport has a 13,700-square-meter main passenger terminal designed to accommodate around 1.2 million passengers annually.
Facts about New Richmond Regional Airport (RNH):
- Because of New Richmond Regional Airport's relatively low elevation of 997 feet, planes can take off or land at New Richmond Regional Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The airport was commissioned by the FAA in July 1964 with a 3,000-foot primary runway and a 2,100-foot turf runway.
- New Richmond Regional Airport (RNH) has 2 runways.
- The airport has an on-site Automated Weather Observation Station providing continuous aviation weather METAR reports.
- The closest airport to New Richmond Regional Airport (RNH) is Amery Municipal Airport (AHH), which is located only 12 miles (20 kilometers) NE of RNH.
- The furthest airport from New Richmond Regional Airport (RNH) is Margaret River Airport (MGV), which is located 10,784 miles (17,355 kilometers) away in Margaret River, Western Australia, Australia.
- In 2006, construction began on an extension to the 4,003-foot primary runway and parallel taxiway to runway 14-32.
- In 1992, a major construction project was completed.
