Nonstop flight route between Sari, Iran and Bangalore, India:
Departure Airport:

Arrival Airport:

Distance from SRY to BLR:
Share this route:
Jump to:
- About this route
- SRY Airport Information
- BLR Airport Information
- Facts about SRY
- Facts about BLR
- Map of Nearest Airports to SRY
- List of Nearest Airports to SRY
- Map of Furthest Airports from SRY
- List of Furthest Airports from SRY
- Map of Nearest Airports to BLR
- List of Nearest Airports to BLR
- Map of Furthest Airports from BLR
- List of Furthest Airports from BLR
About this route:
A direct, nonstop flight between Sari Dasht-e Naz International Airport (SRY), Sari, Iran and Kempegowda International Airport (BLR), Bangalore, India would travel a Great Circle distance of 2,218 miles (or 3,570 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Sari Dasht-e Naz International Airport and Kempegowda International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
IATA / ICAO Codes: | SRY / OINZ |
Airport Name: | Sari Dasht-e Naz International Airport |
Location: | Sari, Iran |
GPS Coordinates: | 36°38'8"N by 53°11'36"E |
Elevation: | 35 feet (11 meters) |
# of Runways: | 1 |
View all routes: | Routes from SRY |
More Information: | SRY Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | BLR / VOBL |
Airport Name: | Kempegowda International Airport |
Location: | Bangalore, India |
GPS Coordinates: | 13°11'56"N by 77°42'20"E |
Area Served: | Bangalore |
Airport Type: | Public |
Elevation: | 3002 feet (915 meters) |
# of Runways: | 1 |
View all routes: | Routes from BLR |
More Information: | BLR Maps & Info |
Facts about Sari Dasht-e Naz International Airport (SRY):
- Because of Sari Dasht-e Naz International Airport's relatively low elevation of 35 feet, planes can take off or land at Sari Dasht-e Naz International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The closest airport to Sari Dasht-e Naz International Airport (SRY) is Bishe Kola Air Base (BSM), which is located 47 miles (75 kilometers) W of SRY.
- The furthest airport from Sari Dasht-e Naz International Airport (SRY) is Totegegie Airport (GMR), which is located 11,384 miles (18,320 kilometers) away in Mangareva, Gambier Islands, French Polynesia.
- Sari Dasht-e Naz International Airport (SRY) currently has only 1 runway.
Facts about Kempegowda International Airport (BLR):
- The airport project started as a public-private joint venture between Germany's Siemens Project Ventures GmbH, Government of Karnataka and Airports Authority of India.
- BIAL is a Public Limited Company under the Companies Act formed to build, own and operate Kempegowda International Airport.
- The furthest airport from Kempegowda International Airport (BLR) is Mataveri International Airport (IPC), which is located 11,368 miles (18,294 kilometers) away in Easter Island, Chile.
- The closest airport to Kempegowda International Airport (BLR) is Mysore Airport (MYQ), which is located 97 miles (157 kilometers) SW of BLR.
- On 19 January 2010, BIAL embarked on an expansion plan and fast tracked extension of the current terminal, which includes new architectural components.
- Shuttle service provided by the Bangalore Metropolitan Transport Corporation, connects parts of the city to the airport.
- Kempegowda International Airport (BLR) currently has only 1 runway.
- In January 2012, BIAL announced that the airport would remain fully closed to all flight operations from 11 March until 3 April 2012 between 10:30 and 17:30 IST during which the top layer of its only runway was completely replaced.