Nonstop flight route between Brady, Texas, United States and Stuttgart, Germany:
Departure Airport:
Arrival Airport:
Distance from BBD to ZWS:
Share this route:
Jump to:
- About this route
- BBD Airport Information
- ZWS Airport Information
- Facts about BBD
- Facts about ZWS
- Map of Nearest Airports to BBD
- List of Nearest Airports to BBD
- Map of Furthest Airports from BBD
- List of Furthest Airports from BBD
- Map of Nearest Airports to ZWS
- List of Nearest Airports to ZWS
- Map of Furthest Airports from ZWS
- List of Furthest Airports from ZWS
About this route:
A direct, nonstop flight between Curtis Field (BBD), Brady, Texas, United States and Stuttgart Hauptbahnhof (ZWS), Stuttgart, Germany would travel a Great Circle distance of 5,379 miles (or 8,656 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Curtis Field and Stuttgart Hauptbahnhof, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Curtis Field and Stuttgart Hauptbahnhof. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | BBD / KBBD |
| Airport Name: | Curtis Field |
| Location: | Brady, Texas, United States |
| GPS Coordinates: | 31°10'45"N by 99°19'26"W |
| Area Served: | Brady, Texas |
| Operator/Owner: | City of Brady |
| Airport Type: | Public |
| Elevation: | 1827 feet (557 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from BBD |
| More Information: | BBD Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | ZWS / |
| Airport Name: | Stuttgart Hauptbahnhof |
| Location: | Stuttgart, Germany |
| GPS Coordinates: | 48°47'2"N by 9°10'54"E |
| Elevation: | 0 feet (0 meters) |
| View all routes: | Routes from ZWS |
| More Information: | ZWS Maps & Info |
Facts about Curtis Field (BBD):
- It is notable that enlisted sergeant pilots received their primary flight training at Curtis Field in early 1942.
- The closest airport to Curtis Field (BBD) is Coleman Municipal Airport (COM), which is located 46 miles (74 kilometers) N of BBD.
- The furthest airport from Curtis Field (BBD) is Sir Gaëtan Duval Airport (RRG), which is located 11,102 miles (17,867 kilometers) away in Rodrigues Island, Mauritius.
- Curtis Field (BBD) has 2 runways.
Facts about Stuttgart Hauptbahnhof (ZWS):
- In 1910, the Royal Württemberg State Railways underwrote an architectural contest, which saw 70 participants.
- The front of the building features a quote by Georg Wilhelm Friedrich Hegel in the form of a lit inscription - the quote reads … daß diese Furcht zu irren schon der Irrtum selbst ist.
- The closest airport to Stuttgart Hauptbahnhof (ZWS) is Stuttgart Airport (STR), which is located only 7 miles (11 kilometers) SSE of ZWS.
- Because of Stuttgart Hauptbahnhof's relatively low elevation of 0 feet, planes can take off or land at Stuttgart Hauptbahnhof at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- More than 18,000 people have registered as Parkschützer.
- The station building was constructed using reinforced concrete, which was then covered with roughly hewn shell limestone ashlar, sourced from the area around Crailsheim.
- The furthest airport from Stuttgart Hauptbahnhof (ZWS) is Chatham Islands (CHT), which is nearly antipodal to Stuttgart Hauptbahnhof (meaning Stuttgart Hauptbahnhof is almost on the exact opposite side of the Earth from Chatham Islands), and is located 12,001 miles (19,313 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- Construction on the new underground station as part of Stuttgart 21 was originally to be started in 2005 and completed in 2012.
