Nonstop flight route between Lisbon, Portugal and Hambantota, Sri Lanka:
Departure Airport:
Arrival Airport:
Distance from LIS to HRI:
Share this route:
Jump to:
- About this route
- LIS Airport Information
- HRI Airport Information
- Facts about LIS
- Facts about HRI
- Map of Nearest Airports to LIS
- List of Nearest Airports to LIS
- Map of Furthest Airports from LIS
- List of Furthest Airports from LIS
- Map of Nearest Airports to HRI
- List of Nearest Airports to HRI
- Map of Furthest Airports from HRI
- List of Furthest Airports from HRI
About this route:
A direct, nonstop flight between Lisbon Portela Airport (LIS), Lisbon, Portugal and Mattala Rajapaksa International Airport (HRI), Hambantota, Sri Lanka would travel a Great Circle distance of 5,960 miles (or 9,592 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Lisbon Portela Airport and Mattala Rajapaksa International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Lisbon Portela Airport and Mattala Rajapaksa International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | LIS / LPPT |
| Airport Names: |
|
| Location: | Lisbon, Portugal |
| GPS Coordinates: | 38°46'27"N by 9°8'3"W |
| Area Served: | Lisbon, Portugal |
| Operator/Owner: | Vinci Group |
| Airport Type: | Public |
| Elevation: | 374 feet (114 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from LIS |
| More Information: | LIS Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | HRI / VCRI |
| Airport Names: |
|
| Location: | Hambantota, Sri Lanka |
| GPS Coordinates: | 6°17'20"N by 81°7'24"E |
| Area Served: | Hambantota |
| Operator/Owner: | Sri Lankan Government |
| Airport Type: | Public |
| Elevation: | 157 feet (48 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from HRI |
| More Information: | HRI Maps & Info |
Facts about Lisbon Portela Airport (LIS):
- Lisbon Portela Airport handled 16,024,955 passengers last year.
- Because of Lisbon Portela Airport's relatively low elevation of 374 feet, planes can take off or land at Lisbon Portela Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The airport is the main hub of TAP Portugal and its subsidiary Portugália, a focus city for easyJet, Ryanair and SATA International and also the base for charter airlines euroAtlantic Airways, Hi Fly and White Airways.
- The closest airport to Lisbon Portela Airport (LIS) is Beja Airport (BYJ), which is located 81 miles (130 kilometers) SE of LIS.
- The furthest airport from Lisbon Portela Airport (LIS) is New Plymouth Airport (NPL), which is nearly antipodal to Lisbon Portela Airport (meaning Lisbon Portela Airport is almost on the exact opposite side of the Earth from New Plymouth Airport), and is located 12,258 miles (19,727 kilometers) away in New Plymouth, New Zealand.
- In addition to being known as "Lisbon Portela Airport", another name for LIS is "Aeroporto da Portela".
- Lisbon Portela Airport (LIS) has 2 runways.
- A major upgrade in 1959–62 included a new runway capable of taking the first generation jets, Boeing 707 and Douglas DC-8.
- The airport is the main international gateway to Portugal and a major European hub.
- In November 2006, the company operating the airport, ANA – Aeroportos de Portugal, announced an expansion plan for some airport structures, in order to respond to current passenger traffic growth trends and full capacity use of the airport, originally intended to respond to growth until the new airport was to be finished in 2017.
- Lisbon airport has an underground Metro de Lisboa station at the Southern edge of the Terminal 1 arrivals area.
Facts about Mattala Rajapaksa International Airport (HRI):
- The Runway dimensions are 3500m * 60m with 7.5m paved shoulders either side and 260m Runway safety area on both runway ends.
- Because of Mattala Rajapaksa International Airport's relatively low elevation of 157 feet, planes can take off or land at Mattala Rajapaksa International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Mattala Rajapaksa International Airport (HRI) currently has only 1 runway.
- The furthest airport from Mattala Rajapaksa International Airport (HRI) is Seymour Airport (GPS), which is located 11,719 miles (18,860 kilometers) away in Baltra Island, Galápagos Islands, Ecuador.
- In addition to being known as "Mattala Rajapaksa International Airport", another name for HRI is "මත්තල රාජපක්ෂ ජාත්යන්තර ගුවන්තොටුපළமத்தல ராஜபக்ஷ பன்னாட்டு விமான நிலையம்".
- On 24 January 2013, Sri Lanka Minister of Civil Aviation Piyankara Jayaratne said in parliament that the airport would be declared open on 18 March 2013.
- The closest airport to Mattala Rajapaksa International Airport (HRI) is Weerawila Airport (WRZ), which is located only 8 miles (13 kilometers) ESE of HRI.
- The second stage of the HIA project the construction will begin in 2013 and is to be completed by 2016.
- On October 2012, the Super King 20 Test Aircraft, which belongs to the Pakistan Civil Aviation Department and features a dual engine, landed on the new runway to test the newly constructed runway and the instrumentation.
- It was initially planned to build an international airport serving the south of Sri Lanka at Weerawila, but the plans were scrapped due to environmental concerns.
- Construction of phase one began on 27 November 2009 at Mattala.
