Nonstop flight route between Pekanbaru, Sumatra, Indonesia and Hambantota, Sri Lanka:
Departure Airport:
Arrival Airport:
Distance from PKU to HRI:
Share this route:
Jump to:
- About this route
- PKU Airport Information
- HRI Airport Information
- Facts about PKU
- Facts about HRI
- Map of Nearest Airports to PKU
- List of Nearest Airports to PKU
- Map of Furthest Airports from PKU
- List of Furthest Airports from PKU
- Map of Nearest Airports to HRI
- List of Nearest Airports to HRI
- Map of Furthest Airports from HRI
- List of Furthest Airports from HRI
About this route:
A direct, nonstop flight between Sultan Syarif Kasim II International Airport (PKU), Pekanbaru, Sumatra, Indonesia and Mattala Rajapaksa International Airport (HRI), Hambantota, Sri Lanka would travel a Great Circle distance of 1,458 miles (or 2,346 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Sultan Syarif Kasim II International Airport and Mattala Rajapaksa International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
IATA / ICAO Codes: | PKU / WIBB |
Airport Names: |
|
Location: | Pekanbaru, Sumatra, Indonesia |
GPS Coordinates: | 0°27'38"N by 101°26'39"E |
Area Served: | Pekanbaru |
Operator/Owner: | PT Angkasa Pura II |
Airport Type: | Public, Military |
Elevation: | 104 feet (32 meters) |
# of Runways: | 1 |
View all routes: | Routes from PKU |
More Information: | PKU Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | HRI / VCRI |
Airport Names: |
|
Location: | Hambantota, Sri Lanka |
GPS Coordinates: | 6°17'20"N by 81°7'24"E |
Area Served: | Hambantota |
Operator/Owner: | Sri Lankan Government |
Airport Type: | Public |
Elevation: | 157 feet (48 meters) |
# of Runways: | 1 |
View all routes: | Routes from HRI |
More Information: | HRI Maps & Info |
Facts about Sultan Syarif Kasim II International Airport (PKU):
- In addition to being known as "Sultan Syarif Kasim II International Airport", other names for PKU include "Bandar Udara Internasional Sultan Syarif Kasim II" and "بندر اودارا اينترنسيونل سلطان شريف قاسم ٢".
- The closest airport to Sultan Syarif Kasim II International Airport (PKU) is Pinang Kampai Airport (DUM), which is located 79 miles (128 kilometers) N of PKU.
- By end of June 2011, a new terminal spanning 17,000 square meters and a more spacious aircraft apron which can accommodate 10 wide-body aircraft, twice the capacity of the old apron will be operated.
- On 16 July 2012, a Rp 2 trillion new terminal has been opened to accommodate 1.5 million passengers a year and serve 8 Boeing 737-900ER aircraft and 2 Boeing 747 jumbo jets at the same time.
- The airport serves flights to and from several cities in Indonesia and neighbouring countries such as Malaysia and Singapore.
- Sultan Syarif Kasim II International Airport handled 392,399 passengers last year.
- VIP lounge is located on the eastern side the terminal of Sultan Syarif Kasim II Airport.
- The furthest airport from Sultan Syarif Kasim II International Airport (PKU) is Mariscal Sucre International Airport (UIO), which is nearly antipodal to Sultan Syarif Kasim II International Airport (meaning Sultan Syarif Kasim II International Airport is almost on the exact opposite side of the Earth from Mariscal Sucre International Airport), and is located 12,409 miles (19,971 kilometers) away in Quito, Ecuador.
- Sultan Syarif Kasim II International Airport (PKU) currently has only 1 runway.
- In early 2010, the first phase of the airport's expansion started with the construction of a new terminal to replace the 1980s built terminal.
- Sultan Syarif Kasim II International Airport is an international airport that serves the city of Pekanbaru, Riau, Indonesia.
- Because of Sultan Syarif Kasim II International Airport's relatively low elevation of 104 feet, planes can take off or land at Sultan Syarif Kasim II International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
Facts about Mattala Rajapaksa International Airport (HRI):
- On 16 October 2012, a Hawker Beechcraft B200 King Air registered AP-CAB, belonging to the Civil Aviation Authority of Pakistan landed on runway 23 at 12.38 PM local time becoming the first aircraft to land at the new airport as requested by the Rajapaksa regime.
- The closest airport to Mattala Rajapaksa International Airport (HRI) is Weerawila Airport (WRZ), which is located only 8 miles (13 kilometers) ESE of HRI.
- Because of Mattala Rajapaksa International Airport's relatively low elevation of 157 feet, planes can take off or land at Mattala Rajapaksa International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- A new aerodrome designed to meet the ICAO specification for code 4F is to be built.
- The second stage of the HIA project the construction will begin in 2013 and is to be completed by 2016.
- The furthest airport from Mattala Rajapaksa International Airport (HRI) is Seymour Airport (GPS), which is located 11,719 miles (18,860 kilometers) away in Baltra Island, Galápagos Islands, Ecuador.
- Domestic carriers Helitours and Cinnamon Air offer charter flights that connect the airport with Ratmalana Airport and Bandaranaike International Airport in Colombo.
- In addition to being known as "Mattala Rajapaksa International Airport", another name for HRI is "මත්තල රාජපක්ෂ ජාත්යන්තර ගුවන්තොටුපළமத்தல ராஜபக்ஷ பன்னாட்டு விமான நிலையம்".
- This project will have two phases, with the first phase expected to be completed by the end of October 2012.
- Mattala Rajapaksa International Airport (HRI) currently has only 1 runway.