Nonstop flight route between Bury St. Edmunds, England, United Kingdom and Tbilisi, Georgia:
Departure Airport:
Arrival Airport:
Distance from BEQ to TBS:
Share this route:
Jump to:
- About this route
- BEQ Airport Information
- TBS Airport Information
- Facts about BEQ
- Facts about TBS
- Map of Nearest Airports to BEQ
- List of Nearest Airports to BEQ
- Map of Furthest Airports from BEQ
- List of Furthest Airports from BEQ
- Map of Nearest Airports to TBS
- List of Nearest Airports to TBS
- Map of Furthest Airports from TBS
- List of Furthest Airports from TBS
About this route:
A direct, nonstop flight between RAF Honington USAAF Station 375 (BEQ), Bury St. Edmunds, England, United Kingdom and Tbilisi Airport (TBS), Tbilisi, Georgia would travel a Great Circle distance of 2,169 miles (or 3,491 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between RAF Honington USAAF Station 375 and Tbilisi Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
IATA / ICAO Codes: | BEQ / EGXH |
Airport Name: | RAF Honington USAAF Station 375 |
Location: | Bury St. Edmunds, England, United Kingdom |
GPS Coordinates: | 52°20'33"N by 0°46'23"E |
Operator/Owner: | Ministry of Defence |
View all routes: | Routes from BEQ |
More Information: | BEQ Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | TBS / UGTB |
Airport Names: |
|
Location: | Tbilisi, Georgia |
GPS Coordinates: | 41°40'9"N by 44°57'16"E |
Area Served: | Tbilisi |
Operator/Owner: | United Airports of Georgia LLC |
Airport Type: | Public |
Elevation: | 1624 feet (495 meters) |
# of Runways: | 2 |
View all routes: | Routes from TBS |
More Information: | TBS Maps & Info |
Facts about RAF Honington USAAF Station 375 (BEQ):
- In June 1942, the airfield was transferred to the USAAF and was upgraded to a Class A Bomber base.
- Although the last mission by the 364th took place on 25 April 1945, the group did not depart until November, returning to Camp Kilmer, New Jersey, for inactivation.
- English Electric Canberra bomber squadrons, 10, XV, 44, and 57 were based at RAF Honington from February 1955 to 1957.
- Honington was assigned USAAF designation Station 375.
- The closest airport to RAF Honington USAAF Station 375 (BEQ) is RAF Lakenheath (LKZ), which is located only 10 miles (16 kilometers) WNW of BEQ.
- The furthest airport from RAF Honington USAAF Station 375 (BEQ) is Chatham Islands (CHT), which is located 11,834 miles (19,044 kilometers) away in Waitangi, Chatham Islands, New Zealand.
Facts about Tbilisi Airport (TBS):
- “The operational rights of TAV Urban Georgia have been extended for 10 years 9 months from February 2027 to November 8, 2037 within the scope of the agreement of Built-Operate-Transfer in exchange for the reconstruction investment,” TAV Airports Holding said in a statement on August 24.
- In addition to being known as "Tbilisi Airport", another name for TBS is "თბილისის საერთაშორისო აეროპორტი".
- The closest airport to Tbilisi Airport (TBS) is Shirak International Airport (LWN), which is located 85 miles (137 kilometers) SW of TBS.
- Tbilisi International Airport is operated by TAV since October, 2005.
- Tbilisi Airport (TBS) has 2 runways.
- The implementing agency and the borrower for the project is TAV Urban Georgia, a concessionaire and special purpose vehicle for the construction and operation of the airport.
- The furthest airport from Tbilisi Airport (TBS) is Totegegie Airport (GMR), which is located 11,153 miles (17,948 kilometers) away in Mangareva, Gambier Islands, French Polynesia.
- “It has been planned to get the investment on reconstruction of the runway started in September 2012 and complete the project in less than 2 years,” the company said.