Nonstop flight route between Bou Saada, M'Sila, Algeria and Bangalore, India:
Departure Airport:
Arrival Airport:
Distance from BUJ to BLR:
Share this route:
Jump to:
- About this route
- BUJ Airport Information
- BLR Airport Information
- Facts about BUJ
- Facts about BLR
- Map of Nearest Airports to BUJ
- List of Nearest Airports to BUJ
- Map of Furthest Airports from BUJ
- List of Furthest Airports from BUJ
- Map of Nearest Airports to BLR
- List of Nearest Airports to BLR
- Map of Furthest Airports from BLR
- List of Furthest Airports from BLR
About this route:
A direct, nonstop flight between Bou Saada Airport (BUJ), Bou Saada, M'Sila, Algeria and Kempegowda International Airport (BLR), Bangalore, India would travel a Great Circle distance of 4,771 miles (or 7,677 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Bou Saada Airport and Kempegowda International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Bou Saada Airport and Kempegowda International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | BUJ / DAAD |
| Airport Names: |
|
| Location: | Bou Saada, M'Sila, Algeria |
| GPS Coordinates: | 35°19'57"N by 4°12'20"E |
| Area Served: | Bou Saada, Algeria |
| Airport Type: | Public |
| Elevation: | 1506 feet (459 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from BUJ |
| More Information: | BUJ Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | BLR / VOBL |
| Airport Name: | Kempegowda International Airport |
| Location: | Bangalore, India |
| GPS Coordinates: | 13°11'56"N by 77°42'20"E |
| Area Served: | Bangalore |
| Airport Type: | Public |
| Elevation: | 3002 feet (915 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from BLR |
| More Information: | BLR Maps & Info |
Facts about Bou Saada Airport (BUJ):
- Bou Saada Airport (BUJ) currently has only 1 runway.
- The furthest airport from Bou Saada Airport (BUJ) is Gisborne Airport (GIS), which is nearly antipodal to Bou Saada Airport (meaning Bou Saada Airport is almost on the exact opposite side of the Earth from Gisborne Airport), and is located 12,023 miles (19,350 kilometers) away in Gisborne, New Zealand.
- In addition to being known as "Bou Saada Airport", another name for BUJ is "Bou Saada Airport (Bou Saada)".
- The closest airport to Bou Saada Airport (BUJ) is Ain Arnat Airport (QSF), which is located 84 miles (135 kilometers) NE of BUJ.
Facts about Kempegowda International Airport (BLR):
- Kempegowda International Airport was expected to be inaugurated on 30 March 2008, but due to delays in air traffic control services, it was finally inaugurated on 23 May 2008 just before midnight when a Jet Airways flight from Mumbai landed.
- The closest airport to Kempegowda International Airport (BLR) is Mysore Airport (MYQ), which is located 97 miles (157 kilometers) SW of BLR.
- The furthest airport from Kempegowda International Airport (BLR) is Mataveri International Airport (IPC), which is located 11,368 miles (18,294 kilometers) away in Easter Island, Chile.
- Kempegowda International Airport (BLR) currently has only 1 runway.
- The airport has 38 gates, 20 aero-bridges, including three double arm, and 18 remote bus bays.
- As an alternative to taxis, passengers can use car rental services.
- The airport project started as a public-private joint venture between Germany's Siemens Project Ventures GmbH, Government of Karnataka and Airports Authority of India.
- In January 2012, BIAL announced that the airport would remain fully closed to all flight operations from 11 March until 3 April 2012 between 10:30 and 17:30 IST during which the top layer of its only runway was completely replaced.
