Nonstop flight route between Wheeling, West Virginia, United States and Mangere, New Zealand:
Departure Airport:
Arrival Airport:
Distance from HLG to AKL:
Share this route:
Jump to:
- About this route
- HLG Airport Information
- AKL Airport Information
- Facts about HLG
- Facts about AKL
- Map of Nearest Airports to HLG
- List of Nearest Airports to HLG
- Map of Furthest Airports from HLG
- List of Furthest Airports from HLG
- Map of Nearest Airports to AKL
- List of Nearest Airports to AKL
- Map of Furthest Airports from AKL
- List of Furthest Airports from AKL
About this route:
A direct, nonstop flight between Wheeling Ohio County Airport (HLG), Wheeling, West Virginia, United States and Auckland Airport (AKL), Mangere, New Zealand would travel a Great Circle distance of 8,485 miles (or 13,655 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Wheeling Ohio County Airport and Auckland Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Wheeling Ohio County Airport and Auckland Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | HLG / KHLG |
Airport Name: | Wheeling Ohio County Airport |
Location: | Wheeling, West Virginia, United States |
GPS Coordinates: | 40°10'29"N by 80°38'47"W |
Area Served: | Wheeling, West Virginia |
Operator/Owner: | Ohio County Commission |
Airport Type: | Public |
Elevation: | 1195 feet (364 meters) |
# of Runways: | 2 |
View all routes: | Routes from HLG |
More Information: | HLG Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | AKL / NZAA |
Airport Name: | Auckland Airport |
Location: | Mangere, New Zealand |
GPS Coordinates: | 37°0'29"S by 174°47'30"E |
Area Served: | Auckland |
Operator/Owner: | AIAL |
Airport Type: | Public |
Elevation: | 23 feet (7 meters) |
# of Runways: | 2 |
View all routes: | Routes from AKL |
More Information: | AKL Maps & Info |
Facts about Wheeling Ohio County Airport (HLG):
- The closest airport to Wheeling Ohio County Airport (HLG) is Washington County Airport (WSG), which is located only 19 miles (31 kilometers) E of HLG.
- Wheeling Ohio County Airport (HLG) has 2 runways.
- The furthest airport from Wheeling Ohio County Airport (HLG) is Margaret River Airport (MGV), which is located 11,469 miles (18,458 kilometers) away in Margaret River, Western Australia, Australia.
Facts about Auckland Airport (AKL):
- The furthest airport from Auckland Airport (AKL) is Málaga Airport (AGP), which is nearly antipodal to Auckland Airport (meaning Auckland Airport is almost on the exact opposite side of the Earth from Málaga Airport), and is located 12,391 miles (19,942 kilometers) away in Málaga, Spain.
- Auckland Airport is the largest and busiest airport in New Zealand with 14,829,393 passengers in the year ended November 2013.
- Because of Auckland Airport's relatively low elevation of 23 feet, planes can take off or land at Auckland Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Auckland Airport handled 14,829,393 passengers last year.
- The closest airport to Auckland Airport (AKL) is Ardmore Airport (AMZ), which is located only 10 miles (16 kilometers) E of AKL.
- Before 2006 Auckland Airport arriving and departing passengers were allowed to mingle airside.
- Auckland Airport (AKL) has 2 runways.
- AIAL enjoys diverse revenue streams, and operates a 'dual-till' approach, whereby its finances are split into aeronautical and non-aeronautical balance sheets.
- In 2007, construction began on a second runway to the north of the current one.