Nonstop flight route between Ivalo, Finland and Stuttgart, Germany:
Departure Airport:
Arrival Airport:
Distance from IVL to ZWS:
Share this route:
Jump to:
- About this route
- IVL Airport Information
- ZWS Airport Information
- Facts about IVL
- Facts about ZWS
- Map of Nearest Airports to IVL
- List of Nearest Airports to IVL
- Map of Furthest Airports from IVL
- List of Furthest Airports from IVL
- Map of Nearest Airports to ZWS
- List of Nearest Airports to ZWS
- Map of Furthest Airports from ZWS
- List of Furthest Airports from ZWS
About this route:
A direct, nonstop flight between Ivalo Airport (IVL), Ivalo, Finland and Stuttgart Hauptbahnhof (ZWS), Stuttgart, Germany would travel a Great Circle distance of 1,504 miles (or 2,421 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Ivalo Airport and Stuttgart Hauptbahnhof, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | IVL / EFIV |
| Airport Names: |
|
| Location: | Ivalo, Finland |
| GPS Coordinates: | 68°36'38"N by 27°24'50"E |
| Area Served: | Inari |
| Operator/Owner: | Finavia |
| Airport Type: | Public |
| Elevation: | 482 feet (147 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from IVL |
| More Information: | IVL Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | ZWS / |
| Airport Name: | Stuttgart Hauptbahnhof |
| Location: | Stuttgart, Germany |
| GPS Coordinates: | 48°47'2"N by 9°10'54"E |
| Elevation: | 0 feet (0 meters) |
| View all routes: | Routes from ZWS |
| More Information: | ZWS Maps & Info |
Facts about Ivalo Airport (IVL):
- Ivalo Airport (IVL) currently has only 1 runway.
- The furthest airport from Ivalo Airport (IVL) is Chatham Islands (CHT), which is located 10,522 miles (16,933 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- The closest airport to Ivalo Airport (IVL) is Kittilä Airport (KTT), which is located 91 miles (147 kilometers) SW of IVL.
- Because of Ivalo Airport's relatively low elevation of 482 feet, planes can take off or land at Ivalo Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Ivalo Airport handled 111,940 passengers last year.
- In addition to being known as "Ivalo Airport", another name for IVL is "Ivalon lentoasema".
Facts about Stuttgart Hauptbahnhof (ZWS):
- Because of Stuttgart Hauptbahnhof's relatively low elevation of 0 feet, planes can take off or land at Stuttgart Hauptbahnhof at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- The furthest airport from Stuttgart Hauptbahnhof (ZWS) is Chatham Islands (CHT), which is nearly antipodal to Stuttgart Hauptbahnhof (meaning Stuttgart Hauptbahnhof is almost on the exact opposite side of the Earth from Chatham Islands), and is located 12,001 miles (19,313 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- Due to increasing railway traffic, the first building was replaced by new construction in the same spot in the 1860s.
- On November 27, 2011, a referendum on the project "Stuttgart 21" resulted in 58.8% voted in favor of the project, 41.2% voted against it.
- The closest airport to Stuttgart Hauptbahnhof (ZWS) is Stuttgart Airport (STR), which is located only 7 miles (11 kilometers) SSE of ZWS.
- In November 2009, preservationists of the International Council on Monuments and Sites nominated the building for inclusion in UNESCO’s World Cultural Heritage list, an occasion that opponents of the Stuttgart 21 project picked to urge the city and Deutsche Bahn to stop the project which implies demolition of parts of the complex designed by Paul Bonatz.
- On 15 May 1933, the electrification of all 17 tracks was completed.
- Construction on the new underground station as part of Stuttgart 21 was originally to be started in 2005 and completed in 2012.
- Under the station forecourt, the seven lines of the Stadtbahn traverse the 2nd underground floor.
