Nonstop flight route between Aix-en-Provence / Les Milles, France and Tbilisi, Georgia:
Departure Airport:
Arrival Airport:
Distance from QXB to TBS:
Share this route:
Jump to:
- About this route
- QXB Airport Information
- TBS Airport Information
- Facts about QXB
- Facts about TBS
- Map of Nearest Airports to QXB
- List of Nearest Airports to QXB
- Map of Furthest Airports from QXB
- List of Furthest Airports from QXB
- Map of Nearest Airports to TBS
- List of Nearest Airports to TBS
- Map of Furthest Airports from TBS
- List of Furthest Airports from TBS
About this route:
A direct, nonstop flight between Aix-en-Provence Aerodrome (QXB), Aix-en-Provence / Les Milles, France and Tbilisi Airport (TBS), Tbilisi, Georgia would travel a Great Circle distance of 1,999 miles (or 3,217 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Aix-en-Provence Aerodrome and Tbilisi Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | QXB / LFMA |
| Airport Names: |
|
| Location: | Aix-en-Provence / Les Milles, France |
| GPS Coordinates: | 43°30'19"N by 5°22'1"E |
| Area Served: | Aix-en-Provence |
| Operator/Owner: | CCI Marseille Provence |
| Airport Type: | Public |
| Elevation: | 368 feet (112 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from QXB |
| More Information: | QXB Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | TBS / UGTB |
| Airport Names: |
|
| Location: | Tbilisi, Georgia |
| GPS Coordinates: | 41°40'9"N by 44°57'16"E |
| Area Served: | Tbilisi |
| Operator/Owner: | United Airports of Georgia LLC |
| Airport Type: | Public |
| Elevation: | 1624 feet (495 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from TBS |
| More Information: | TBS Maps & Info |
Facts about Aix-en-Provence Aerodrome (QXB):
- The furthest airport from Aix-en-Provence Aerodrome (QXB) is Chatham Islands (CHT), which is nearly antipodal to Aix-en-Provence Aerodrome (meaning Aix-en-Provence Aerodrome is almost on the exact opposite side of the Earth from Chatham Islands), and is located 12,343 miles (19,864 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- Aix-en-Provence Aerodrome (QXB) currently has only 1 runway.
- The closest airport to Aix-en-Provence Aerodrome (QXB) is Marseille Provence Airport (MRS), which is located only 9 miles (14 kilometers) WSW of QXB.
- In addition to being known as "Aix-en-Provence Aerodrome", other names for QXB include "'Aérodrome d'Aix-en-Provence(Advanced Landing Ground Y-15)" and "(Advanced Landing Ground Y-15)".
- Because of Aix-en-Provence Aerodrome's relatively low elevation of 368 feet, planes can take off or land at Aix-en-Provence Aerodrome at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
Facts about Tbilisi Airport (TBS):
- Tbilisi Airport (TBS) has 2 runways.
- The closest airport to Tbilisi Airport (TBS) is Shirak International Airport (LWN), which is located 85 miles (137 kilometers) SW of TBS.
- The furthest airport from Tbilisi Airport (TBS) is Totegegie Airport (GMR), which is located 11,153 miles (17,948 kilometers) away in Mangareva, Gambier Islands, French Polynesia.
- The implementing agency and the borrower for the project is TAV Urban Georgia, a concessionaire and special purpose vehicle for the construction and operation of the airport.
- In addition to being known as "Tbilisi Airport", another name for TBS is "თბილისის საერთაშორისო აეროპორტი".
- “It has been planned to get the investment on reconstruction of the runway started in September 2012 and complete the project in less than 2 years,” the company said.
