Nonstop flight route between Tartu, Estonia and Geneva, Switzerland:
Departure Airport:

Arrival Airport:

Distance from TAY to GVA:
Share this route:
Jump to:
- About this route
- TAY Airport Information
- GVA Airport Information
- Facts about TAY
- Facts about GVA
- Map of Nearest Airports to TAY
- List of Nearest Airports to TAY
- Map of Furthest Airports from TAY
- List of Furthest Airports from TAY
- Map of Nearest Airports to GVA
- List of Nearest Airports to GVA
- Map of Furthest Airports from GVA
- List of Furthest Airports from GVA
About this route:
A direct, nonstop flight between Tartu Airport (TAY), Tartu, Estonia and Geneva International Airport (GVA), Geneva, Switzerland would travel a Great Circle distance of 1,196 miles (or 1,925 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Tartu Airport and Geneva International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
IATA / ICAO Codes: | TAY / EETU |
Airport Names: |
|
Location: | Tartu, Estonia |
GPS Coordinates: | 58°18'26"N by 26°41'12"E |
Area Served: | Tartu |
Operator/Owner: | Tallinn Airport Ltd |
Airport Type: | Public |
Elevation: | 219 feet (67 meters) |
# of Runways: | 1 |
View all routes: | Routes from TAY |
More Information: | TAY Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | GVA / LSGG |
Airport Names: |
|
Location: | Geneva, Switzerland |
GPS Coordinates: | 46°14'17"N by 6°6'33"E |
Area Served: | Geneva, Switzerland |
Operator/Owner: | City of Geneva |
Airport Type: | Public |
Elevation: | 1411 feet (430 meters) |
# of Runways: | 2 |
View all routes: | Routes from GVA |
More Information: | GVA Maps & Info |
Facts about Tartu Airport (TAY):
- In addition to being known as "Tartu Airport", another name for TAY is "Tartu lennujaam".
- The closest airport to Tartu Airport (TAY) is Pskov Airport (PKV), which is located 72 miles (116 kilometers) ESE of TAY.
- Because of Tartu Airport's relatively low elevation of 219 feet, planes can take off or land at Tartu Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- In 2010 Tartu Airport served 23,504 passengers.
- Tartu Airport (TAY) currently has only 1 runway.
- The furthest airport from Tartu Airport (TAY) is Chatham Islands (CHT), which is located 11,031 miles (17,753 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- The airport was opened on 15 May 1946.
Facts about Geneva International Airport (GVA):
- In addition to being known as "Geneva International Airport", another name for GVA is "Aéroport international de GenèveGenève aéroport".
- The closest airport to Geneva International Airport (GVA) is Annemasse Aerodrome (QNJ), which is located only 8 miles (13 kilometers) ESE of GVA.
- The furthest airport from Geneva International Airport (GVA) is Chatham Islands (CHT), which is nearly antipodal to Geneva International Airport (meaning Geneva International Airport is almost on the exact opposite side of the Earth from Chatham Islands), and is located 12,227 miles (19,678 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- On May 7, 1968, Geneva Main Terminal was inaugurated, which was planned to accommodate 7 million passengers a year.
- Geneva International Airport (GVA) has 2 runways.
- Geneva International Airport handled 14,436,000 passengers last year.
- Before Switzerland's integration into the Schengen Area in 2008, Pier F, also known as the French Sector, was used exclusively for passengers arriving from, or departing to French destinations.
- In 1968 the construction of a second runway and a mid-field round terminal were proposed, but ultimately the concept was never realised.