Nonstop flight route between Hami City, Xinjiang, China and Jakarta, Indonesia:
Departure Airport:
Arrival Airport:
Distance from HMI to CGK:
Share this route:
Jump to:
- About this route
- HMI Airport Information
- CGK Airport Information
- Facts about HMI
- Facts about CGK
- Map of Nearest Airports to HMI
- List of Nearest Airports to HMI
- Map of Furthest Airports from HMI
- List of Furthest Airports from HMI
- Map of Nearest Airports to CGK
- List of Nearest Airports to CGK
- Map of Furthest Airports from CGK
- List of Furthest Airports from CGK
About this route:
A direct, nonstop flight between Hami Airport (HMI), Hami City, Xinjiang, China and Soekarno–Hatta International Airport (CGK), Jakarta, Indonesia would travel a Great Circle distance of 3,480 miles (or 5,601 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Hami Airport and Soekarno–Hatta International Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Hami Airport and Soekarno–Hatta International Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | HMI / ZWHM |
| Airport Names: |
|
| Location: | Hami City, Xinjiang, China |
| GPS Coordinates: | 42°50'33"N by 93°40'9"E |
| Airport Type: | Military/Public |
| Elevation: | 2703 feet (824 meters) |
| View all routes: | Routes from HMI |
| More Information: | HMI Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | CGK / WIII |
| Airport Names: |
|
| Location: | Jakarta, Indonesia |
| GPS Coordinates: | 6°7'32"S by 106°39'20"E |
| Area Served: | Jabodetabek |
| Operator/Owner: | Government of Indonesia |
| Airport Type: | Public |
| Elevation: | 32 feet (10 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from CGK |
| More Information: | CGK Maps & Info |
Facts about Hami Airport (HMI):
- In addition to being known as "Hami Airport", other names for HMI include "哈密机场" and "Hāmì Jīchǎng".
- The furthest airport from Hami Airport (HMI) is Gamboa Airport (WCA), which is located 11,799 miles (18,989 kilometers) away in Castro, Chile.
- The closest airport to Hami Airport (HMI) is Dunhuang Airport (DNH), which is located 194 miles (313 kilometers) SSE of HMI.
Facts about Soekarno–Hatta International Airport (CGK):
- The team chose a decentralized system similar to Orly Airport, Lyon Satolas, Hannover Airport and Kansas City Airport due to its simplicity and effectiveness.
- The airport's terminal 1 and 2 was designed by Paul Andreu, a French architect who also designed Paris-Charles de Gaulle Airport.
- The closest airport to Soekarno–Hatta International Airport (CGK) is Halim Perdanakusuma Airport (HLP), which is located only 19 miles (30 kilometers) ESE of CGK.
- The furthest airport from Soekarno–Hatta International Airport (CGK) is Yariguíes Airport (EJA), which is nearly antipodal to Soekarno–Hatta International Airport (meaning Soekarno–Hatta International Airport is almost on the exact opposite side of the Earth from Yariguíes Airport), and is located 12,367 miles (19,903 kilometers) away in Barrancabermeja, Colombia.
- This is the propose terminal for soetta that can handled up to 120 million passanger a year for the airport statics.
- To anticipate a surge in passenger numbers, at least a ten percent increase each year, the government is preparing to build a third runway.
- Terminal 2 is the second terminal built, finished in 1991.
- Between 1974 and 1975, a Canadian consultant/consortium, consisting of Aviation Planning Services Ltd., ACRESS International Ltd., and Searle Wilbee Rowland, won a bid for the new airport feasibility project.
- On 20 May 1980, a four year contract was signed.
- Soekarno–Hatta International Airport (CGK) has 2 runways.
- In addition to being known as "Soekarno–Hatta International Airport", another name for CGK is "Bandar Udara Internasional Soekarno–Hatta".
- Soekarno–Hatta International Airport handled 57,772,762 passengers last year.
- To allocate the land and also determine the provincial border, time was needed.
- Because of Soekarno–Hatta International Airport's relatively low elevation of 32 feet, planes can take off or land at Soekarno–Hatta International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
