Nonstop flight route between Metro Manila, Philippines and Vigo, Galicia, Spain:
Departure Airport:
Arrival Airport:
Distance from MNL to VGO:
Share this route:
Jump to:
- About this route
- MNL Airport Information
- VGO Airport Information
- Facts about MNL
- Facts about VGO
- Map of Nearest Airports to MNL
- List of Nearest Airports to MNL
- Map of Furthest Airports from MNL
- List of Furthest Airports from MNL
- Map of Nearest Airports to VGO
- List of Nearest Airports to VGO
- Map of Furthest Airports from VGO
- List of Furthest Airports from VGO
About this route:
A direct, nonstop flight between Ninoy Aquino International Airport (MNL), Metro Manila, Philippines and Vigo Airport (VGO), Vigo, Galicia, Spain would travel a Great Circle distance of 7,379 miles (or 11,875 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Ninoy Aquino International Airport and Vigo Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Ninoy Aquino International Airport and Vigo Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | MNL / RPLL |
| Airport Names: |
|
| Location: | Metro Manila, Philippines |
| GPS Coordinates: | 14°30'30"N by 121°1'9"E |
| Area Served: | Greater Manila Area |
| Airport Type: | Public |
| Elevation: | 75 feet (23 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from MNL |
| More Information: | MNL Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | VGO / LEVX |
| Airport Names: |
|
| Location: | Vigo, Galicia, Spain |
| GPS Coordinates: | 42°13'45"N by 8°37'38"W |
| Area Served: | Vigo |
| Airport Type: | Civil |
| Elevation: | 855 feet (261 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from VGO |
| More Information: | VGO Maps & Info |
Facts about Ninoy Aquino International Airport (MNL):
- The furthest airport from Ninoy Aquino International Airport (MNL) is Brigadeiro Camarão Airport (BVH), which is nearly antipodal to Ninoy Aquino International Airport (meaning Ninoy Aquino International Airport is almost on the exact opposite side of the Earth from Brigadeiro Camarão Airport), and is located 12,291 miles (19,780 kilometers) away in Vilhena, Rondônia, Brazil.
- Because of Ninoy Aquino International Airport's relatively low elevation of 75 feet, planes can take off or land at Ninoy Aquino International Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- This table of passenger movements at MNL is based on data from Airport Council International.
- The third terminal of the airport, Terminal 3 or NAIA-3, is the newest and biggest terminal in the NAIA complex, wherein construction started in 1997.
- In addition to being known as "Ninoy Aquino International Airport", another name for MNL is "Paliparang Pandaigdig ng Ninoy Aquino".
- While the original agreement was one in which PairCargo and Fraport AG would operate the airport for several years after its construction, followed by a handing over of the terminal to the Philippine Government, the government offered to buy out Fraport AG for $400 million, to which Fraport agreed.
- Ninoy Aquino International Airport (MNL) has 2 runways.
- Its apron area has a size of 147,400 square metres.
- The company focuses on maintenance checks for the Airbus A320 family and A330/A340 aircraft.
- Ninoy Aquino International Airport handled 3,286,500 passengers last year.
- The Philippine government has made a new plan where Terminal 3 would be 100% operational by the end of 2011, but lowered their goal to 55% operational after further study.
- The original proposal for the construction of a third terminal was proposed by Asia's Emerging Dragon Corporation.
- The closest airport to Ninoy Aquino International Airport (MNL) is Major Danilo Atienza Air Base (SGL), which is located only 8 miles (14 kilometers) W of MNL.
Facts about Vigo Airport (VGO):
- The neighbouring Santiago de Compostela Airport, also medium-sized, opened its first regular route with the capital Madrid in 1937.
- The furthest airport from Vigo Airport (VGO) is Greymouth Airport (GMN), which is nearly antipodal to Vigo Airport (meaning Vigo Airport is almost on the exact opposite side of the Earth from Greymouth Airport), and is located 12,418 miles (19,985 kilometers) away in Greymouth, New Zealand.
- Vigo Airport (VGO) currently has only 1 runway.
- The closest airport to Vigo Airport (VGO) is Braga Airport (BGZ), which is located 45 miles (73 kilometers) SSE of VGO.
- After meeting in the summer of 2008 that would expand the airport terminal Vigo, and after more than a year of delays and conflicting information and would eventually expand the terminal, 24 February 2010, the Board of Directors approved at its meeting Aena the tendering of the works to expand the terminal with a budget of 59,393,578.76 euros.
- Because of Vigo Airport's relatively low elevation of 855 feet, planes can take off or land at Vigo Airport at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Vigo Airport handled 828,725 passengers last year.
- In addition to being known as "Vigo Airport", other names for VGO include "Aeropuerto de Vigo" and "Aeroporto de Vigo".
- In late May 2007, the Board of Aena awarded the construction of the "Vehicle Parking Building, Construction and Technical Block Vigo airport, Dragados SA for an amount of 38,266,145 euros and an execution period of 28 months.
