Nonstop flight route between Uvalde, Texas, United States and Cagayan de Oro City, Philippines:
Departure Airport:
Arrival Airport:
Distance from UVA to CGY:
Share this route:
Jump to:
- About this route
- UVA Airport Information
- CGY Airport Information
- Facts about UVA
- Facts about CGY
- Map of Nearest Airports to UVA
- List of Nearest Airports to UVA
- Map of Furthest Airports from UVA
- List of Furthest Airports from UVA
- Map of Nearest Airports to CGY
- List of Nearest Airports to CGY
- Map of Furthest Airports from CGY
- List of Furthest Airports from CGY
About this route:
A direct, nonstop flight between Garner Field (UVA), Uvalde, Texas, United States and Laguindingan Airport (CGY), Cagayan de Oro City, Philippines would travel a Great Circle distance of 8,503 miles (or 13,684 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Garner Field and Laguindingan Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Garner Field and Laguindingan Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | UVA / KUVA |
Airport Name: | Garner Field |
Location: | Uvalde, Texas, United States |
GPS Coordinates: | 29°12'41"N by 99°44'36"W |
Area Served: | Uvalde, Texas |
Operator/Owner: | City of Uvalde |
Airport Type: | Public |
Elevation: | 942 feet (287 meters) |
# of Runways: | 1 |
View all routes: | Routes from UVA |
More Information: | UVA Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | CGY / RP02 |
Airport Names: |
|
Location: | Cagayan de Oro City, Philippines |
GPS Coordinates: | 8°36'45"N by 124°27'25"E |
Area Served: | Cagayan de Oro, Iligan City |
Operator/Owner: | Civil Aviation Authority of the Philippines |
Airport Type: | Public |
# of Runways: | 1 |
View all routes: | Routes from CGY |
More Information: | CGY Maps & Info |
Facts about Garner Field (UVA):
- The closest airport to Garner Field (UVA) is South Texas Regional Airport at Hondo (HDO), which is located 36 miles (57 kilometers) ENE of UVA.
- Opened in October 1941 with three 6,000 hard surfaced runways,.
- The furthest airport from Garner Field (UVA) is Sir Gaëtan Duval Airport (RRG), which is located 11,192 miles (18,012 kilometers) away in Rodrigues Island, Mauritius.
- Because of Garner Field's relatively low elevation of 942 feet, planes can take off or land at Garner Field at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Garner Field (UVA) currently has only 1 runway.
Facts about Laguindingan Airport (CGY):
- In addition to being known as "Laguindingan Airport", another name for CGY is "Paliparan ng Laguindingan (Filipino)Tugpahanan sa Laguindingan (Cebuano)".
- Laguindingan Airport (CGY) currently has only 1 runway.
- The furthest airport from Laguindingan Airport (CGY) is Piloto Osvaldo Marques Dias Airport (AFL), which is nearly antipodal to Laguindingan Airport (meaning Laguindingan Airport is almost on the exact opposite side of the Earth from Piloto Osvaldo Marques Dias Airport), and is located 12,342 miles (19,863 kilometers) away in Alta Floresta, Brazil.
- The closest airport to Laguindingan Airport (CGY) is Maria Cristina Airport (IGN), which is located 37 miles (60 kilometers) SSW of CGY.
- Ayala Land, who originally owns 183 of 417 hectares of the land acquired by the government to develop the airport complex, has future plans to develop an aerotropolis around the airport.
- On April 18, 2013, DOTC announced that the opening of the airport would be pushed back to June 15, 2013 instead of April 30, 2013 because CAAP has received requests from airline companies to postpone the transfer until after the summer peak season, because the April 30 opening would require the cancellation of several daily trips.
- The airport project is implemented by the Philippine Government through the Department of Transportation and Communications.