Nonstop flight route between Ataq, Yemen and Cagayan de Oro City, Philippines:
Departure Airport:

Arrival Airport:

Distance from AXK to CGY:
Share this route:
Jump to:
- About this route
- AXK Airport Information
- CGY Airport Information
- Facts about AXK
- Facts about CGY
- Map of Nearest Airports to AXK
- List of Nearest Airports to AXK
- Map of Furthest Airports from AXK
- List of Furthest Airports from AXK
- Map of Nearest Airports to CGY
- List of Nearest Airports to CGY
- Map of Furthest Airports from CGY
- List of Furthest Airports from CGY
About this route:
A direct, nonstop flight between Ataq Airport (AXK), Ataq, Yemen and Laguindingan Airport (CGY), Cagayan de Oro City, Philippines would travel a Great Circle distance of 5,248 miles (or 8,446 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Ataq Airport and Laguindingan Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Ataq Airport and Laguindingan Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | AXK / OYAT |
Airport Name: | Ataq Airport |
Location: | Ataq, Yemen |
GPS Coordinates: | 14°33'3"N by 46°49'33"E |
Airport Type: | Public/Military |
Elevation: | 3735 feet (1,138 meters) |
# of Runways: | 1 |
View all routes: | Routes from AXK |
More Information: | AXK Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | CGY / RP02 |
Airport Names: |
|
Location: | Cagayan de Oro City, Philippines |
GPS Coordinates: | 8°36'45"N by 124°27'25"E |
Area Served: | Cagayan de Oro, Iligan City |
Operator/Owner: | Civil Aviation Authority of the Philippines |
Airport Type: | Public |
# of Runways: | 1 |
View all routes: | Routes from CGY |
More Information: | CGY Maps & Info |
Facts about Ataq Airport (AXK):
- The furthest airport from Ataq Airport (AXK) is Pukarua Airport (PUK), which is nearly antipodal to Ataq Airport (meaning Ataq Airport is almost on the exact opposite side of the Earth from Pukarua Airport), and is located 12,074 miles (19,431 kilometers) away in Pukarua, Tuamotus, French Polynesia.
- Ataq Airport (AXK) currently has only 1 runway.
- The closest airport to Ataq Airport (AXK) is Beihan Airport (BHN), which is located 76 miles (122 kilometers) WNW of AXK.
Facts about Laguindingan Airport (CGY):
- The furthest airport from Laguindingan Airport (CGY) is Piloto Osvaldo Marques Dias Airport (AFL), which is nearly antipodal to Laguindingan Airport (meaning Laguindingan Airport is almost on the exact opposite side of the Earth from Piloto Osvaldo Marques Dias Airport), and is located 12,342 miles (19,863 kilometers) away in Alta Floresta, Brazil.
- Laguindingan Airport (CGY) currently has only 1 runway.
- Ayala Land, who originally owns 183 of 417 hectares of the land acquired by the government to develop the airport complex, has future plans to develop an aerotropolis around the airport.
- In addition to being known as "Laguindingan Airport", another name for CGY is "Paliparan ng Laguindingan (Filipino)Tugpahanan sa Laguindingan (Cebuano)".
- An expansion of the passenger and cargo terminals, and parking lot are also currently being planned.
- The closest airport to Laguindingan Airport (CGY) is Maria Cristina Airport (IGN), which is located 37 miles (60 kilometers) SSW of CGY.
- The approved cost of the airport project is US$ 167.09 million or ₱ 7.853 billion.
- On April 18, 2013, DOTC announced that the opening of the airport would be pushed back to June 15, 2013 instead of April 30, 2013 because CAAP has received requests from airline companies to postpone the transfer until after the summer peak season, because the April 30 opening would require the cancellation of several daily trips.