Nonstop flight route between Gurupi, Goiás, Brazil and Stuttgart, Germany:
Departure Airport:
Arrival Airport:
Distance from GRP to ZWS:
Share this route:
Jump to:
- About this route
- GRP Airport Information
- ZWS Airport Information
- Facts about GRP
- Facts about ZWS
- Map of Nearest Airports to GRP
- List of Nearest Airports to GRP
- Map of Furthest Airports from GRP
- List of Furthest Airports from GRP
- Map of Nearest Airports to ZWS
- List of Nearest Airports to ZWS
- Map of Furthest Airports from ZWS
- List of Furthest Airports from ZWS
About this route:
A direct, nonstop flight between Gurupi Airport (GRP), Gurupi, Goiás, Brazil and Stuttgart Hauptbahnhof (ZWS), Stuttgart, Germany would travel a Great Circle distance of 5,479 miles (or 8,817 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Gurupi Airport and Stuttgart Hauptbahnhof, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Gurupi Airport and Stuttgart Hauptbahnhof. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
| IATA / ICAO Codes: | GRP / SWGI |
| Airport Names: |
|
| Location: | Gurupi, Goiás, Brazil |
| GPS Coordinates: | 11°44'24"S by 49°7'55"W |
| Area Served: | Gurupi |
| Airport Type: | Public |
| Elevation: | 1148 feet (350 meters) |
| # of Runways: | 1 |
| View all routes: | Routes from GRP |
| More Information: | GRP Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | ZWS / |
| Airport Name: | Stuttgart Hauptbahnhof |
| Location: | Stuttgart, Germany |
| GPS Coordinates: | 48°47'2"N by 9°10'54"E |
| Elevation: | 0 feet (0 meters) |
| View all routes: | Routes from ZWS |
| More Information: | ZWS Maps & Info |
Facts about Gurupi Airport (GRP):
- In addition to being known as "Gurupi Airport", another name for GRP is "Aeroporto de Gurupi".
- The furthest airport from Gurupi Airport (GRP) is Sayak Airport (SOS), which is nearly antipodal to Gurupi Airport (meaning Gurupi Airport is almost on the exact opposite side of the Earth from Sayak Airport), and is located 12,083 miles (19,445 kilometers) away in Del Carmen, Surigao del Norte, Philippines.
- Gurupi Airport (GRP) currently has only 1 runway.
- The closest airport to Gurupi Airport (GRP) is Palmas–Brigadeiro Lysias Rodrigues Airport (PMW), which is located 113 miles (182 kilometers) NNE of GRP.
Facts about Stuttgart Hauptbahnhof (ZWS):
- The closest airport to Stuttgart Hauptbahnhof (ZWS) is Stuttgart Airport (STR), which is located only 7 miles (11 kilometers) SSE of ZWS.
- The present Hauptbahnhof was built between 1914 and 1928, only about 500 meters east of the former station, on the Arnulf-Klett-Platz.
- The front of the building features a quote by Georg Wilhelm Friedrich Hegel in the form of a lit inscription - the quote reads … daß diese Furcht zu irren schon der Irrtum selbst ist.
- The furthest airport from Stuttgart Hauptbahnhof (ZWS) is Chatham Islands (CHT), which is nearly antipodal to Stuttgart Hauptbahnhof (meaning Stuttgart Hauptbahnhof is almost on the exact opposite side of the Earth from Chatham Islands), and is located 12,001 miles (19,313 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- Because of Stuttgart Hauptbahnhof's relatively low elevation of 0 feet, planes can take off or land at Stuttgart Hauptbahnhof at a lower air speed than at airports located at a higher elevation. This is because the air density is higher closer to sea level than it would otherwise be at higher elevations.
- Construction on the new underground station as part of Stuttgart 21 was originally to be started in 2005 and completed in 2012.
- The connected freight station, which featured a marshaling hump and rail brakes, was closed, due to both the reduction in freight traffic, and in preparation for the Stuttgart 21 project.
