Nonstop flight route between Lebakeng, Lesotho and Cagayan de Oro City, Philippines:
Departure Airport:
Arrival Airport:
Distance from LEF to CGY:
Share this route:
Jump to:
- About this route
- LEF Airport Information
- CGY Airport Information
- Facts about LEF
- Facts about CGY
- Map of Nearest Airports to LEF
- List of Nearest Airports to LEF
- Map of Furthest Airports from LEF
- List of Furthest Airports from LEF
- Map of Nearest Airports to CGY
- List of Nearest Airports to CGY
- Map of Furthest Airports from CGY
- List of Furthest Airports from CGY
About this route:
A direct, nonstop flight between Lebakeng Airport (LEF), Lebakeng, Lesotho and Laguindingan Airport (CGY), Cagayan de Oro City, Philippines would travel a Great Circle distance of 6,860 miles (or 11,040 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Lebakeng Airport and Laguindingan Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Lebakeng Airport and Laguindingan Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | LEF / FXLK |
Airport Name: | Lebakeng Airport |
Location: | Lebakeng, Lesotho |
GPS Coordinates: | 29°53'26"S by 28°39'20"E |
Area Served: | Lebakeng |
Airport Type: | Public |
Elevation: | 6040 feet (1,841 meters) |
# of Runways: | 1 |
View all routes: | Routes from LEF |
More Information: | LEF Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | CGY / RP02 |
Airport Names: |
|
Location: | Cagayan de Oro City, Philippines |
GPS Coordinates: | 8°36'45"N by 124°27'25"E |
Area Served: | Cagayan de Oro, Iligan City |
Operator/Owner: | Civil Aviation Authority of the Philippines |
Airport Type: | Public |
# of Runways: | 1 |
View all routes: | Routes from CGY |
More Information: | CGY Maps & Info |
Facts about Lebakeng Airport (LEF):
- Lebakeng Airport (LEF) currently has only 1 runway.
- Because of Lebakeng Airport's high elevation of 6,040 feet, planes must typically fly at a faster airspeed in order to takeoff or land at LEF. Combined with a high temperature, this could make LEF a "Hot & High" airport, where the air density is lower than it would otherwise be at sea level.
- The furthest airport from Lebakeng Airport (LEF) is Hana Airport (HNM), which is located 11,744 miles (18,900 kilometers) away in Hana, Hawaii, United States.
- The closest airport to Lebakeng Airport (LEF) is Lesobeng Airport (LES), which is located 20 miles (32 kilometers) WNW of LEF.
Facts about Laguindingan Airport (CGY):
- The closest airport to Laguindingan Airport (CGY) is Maria Cristina Airport (IGN), which is located 37 miles (60 kilometers) SSW of CGY.
- In addition to being known as "Laguindingan Airport", another name for CGY is "Paliparan ng Laguindingan (Filipino)Tugpahanan sa Laguindingan (Cebuano)".
- Laguindingan Airport (CGY) currently has only 1 runway.
- The furthest airport from Laguindingan Airport (CGY) is Piloto Osvaldo Marques Dias Airport (AFL), which is nearly antipodal to Laguindingan Airport (meaning Laguindingan Airport is almost on the exact opposite side of the Earth from Piloto Osvaldo Marques Dias Airport), and is located 12,342 miles (19,863 kilometers) away in Alta Floresta, Brazil.
- By early 2008, the start of grading of the airport site area.
- In August 2013, the Project Development and Monitoring Facility Board has approved for the revision of the operations and maintenance of the airport.
- On April 18, 2013, DOTC announced that the opening of the airport would be pushed back to June 15, 2013 instead of April 30, 2013 because CAAP has received requests from airline companies to postpone the transfer until after the summer peak season, because the April 30 opening would require the cancellation of several daily trips.
- The airport project is implemented by the Philippine Government through the Department of Transportation and Communications.