Nonstop flight route between Yuncheng, China and Hyderabad, India:
Departure Airport:
Arrival Airport:
Distance from YCU to HYD:
Share this route:
Jump to:
- About this route
- YCU Airport Information
- HYD Airport Information
- Facts about YCU
- Facts about HYD
- Map of Nearest Airports to YCU
- List of Nearest Airports to YCU
- Map of Furthest Airports from YCU
- List of Furthest Airports from YCU
- Map of Nearest Airports to HYD
- List of Nearest Airports to HYD
- Map of Furthest Airports from HYD
- List of Furthest Airports from HYD
About this route:
A direct, nonstop flight between Yuncheng Guangong Airport (YCU), Yuncheng, China and Rajiv Gandhi International Airport (HYD), Hyderabad, India would travel a Great Circle distance of 2,353 miles (or 3,786 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the relatively short distance between Yuncheng Guangong Airport and Rajiv Gandhi International Airport, the route shown on this map most likely still appears to be a straight line.
Departure Airport Information:
| IATA / ICAO Codes: | YCU / ZBYC |
| Airport Names: |
|
| Location: | Yuncheng, China |
| GPS Coordinates: | 35°7'0"N by 111°2'22"E |
| Area Served: | Yuncheng, Shanxi, China |
| Airport Type: | Public |
| View all routes: | Routes from YCU |
| More Information: | YCU Maps & Info |
Arrival Airport Information:
| IATA / ICAO Codes: | HYD / VOHS |
| Airport Name: | Rajiv Gandhi International Airport |
| Location: | Hyderabad, India |
| GPS Coordinates: | 17°14'23"N by 78°25'41"E |
| Area Served: | Hyderabad |
| Operator/Owner: | Airports Authority of India |
| Airport Type: | Public |
| Elevation: | 2024 feet (617 meters) |
| # of Runways: | 2 |
| View all routes: | Routes from HYD |
| More Information: | HYD Maps & Info |
Facts about Yuncheng Guangong Airport (YCU):
- The closest airport to Yuncheng Guangong Airport (YCU) is Luoyang Beijiao Airport (LYA), which is located 81 miles (130 kilometers) ESE of YCU.
- The airport was opened in February 2005, and expansion was started in May 2007 and completed in August 2008, with a total investment of 350 million yuan.
- Yuncheng Airport has a runway that is 3000 meters long and 60 meters wide, and seven aircraft parking aprons.
- The furthest airport from Yuncheng Guangong Airport (YCU) is Comodoro D. Ricardo Salomón Airport (LGS), which is nearly antipodal to Yuncheng Guangong Airport (meaning Yuncheng Guangong Airport is almost on the exact opposite side of the Earth from Comodoro D. Ricardo Salomón Airport), and is located 12,393 miles (19,945 kilometers) away in Malargüe, Mendoza, Argentina.
- In addition to being known as "Yuncheng Guangong Airport", other names for YCU include "运城关公机场" and "Yùnchéng Guāngōng Jīchǎng".
Facts about Rajiv Gandhi International Airport (HYD):
- The closest airport to Rajiv Gandhi International Airport (HYD) is Begumpet Airport (BPM), which is located only 15 miles (24 kilometers) N of HYD.
- Rajiv Gandhi International Airport (HYD) has 2 runways.
- GMR Hyderabad International Airport Ltd.
- Rajiv Gandhi International Airport, also known as Hyderabad International Airport, or simply RGIA, is an international airport serving the metropolis of Hyderabad located at Shamshabad, about 22 km south of Hyderabad.
- The furthest airport from Rajiv Gandhi International Airport (HYD) is Mataveri International Airport (IPC), which is located 11,587 miles (18,648 kilometers) away in Easter Island, Chile.
- The Hyderabad Metropolitan Development Authority plans to develop a hotel corridor called Regal Broadway to cater to an estimated five million visitors to the city travelling through the international airport in 2008.
- Design and construction began in September 2005, and the airport was opened in March 2008.
- In the second phase of the airport development, Terminal 1 will be expanded to an area of 260,000 m2 to cater to the growing demand.
- Over €80 million will be invested over the next three years covering infrastructure including accommodation for more than 200 trainees per year, six full flight simulators, cabin trainers and engineering tooling.
