Nonstop flight route between Salzburg, Austria and Cagayan de Oro City, Philippines:
Departure Airport:

Arrival Airport:

Distance from SZG to CGY:
Share this route:
Jump to:
- About this route
- SZG Airport Information
- CGY Airport Information
- Facts about SZG
- Facts about CGY
- Map of Nearest Airports to SZG
- List of Nearest Airports to SZG
- Map of Furthest Airports from SZG
- List of Furthest Airports from SZG
- Map of Nearest Airports to CGY
- List of Nearest Airports to CGY
- Map of Furthest Airports from CGY
- List of Furthest Airports from CGY
About this route:
A direct, nonstop flight between Salzburg Airport (SZG), Salzburg, Austria and Laguindingan Airport (CGY), Cagayan de Oro City, Philippines would travel a Great Circle distance of 6,743 miles (or 10,851 kilometers).
A Great Circle is the shortest distance between 2 points on a sphere. Because most world maps are flat (but the Earth is round), the route of the shortest distance between 2 points on the Earth will often appear curved when viewed on a flat map, especially for long distances. If you were to simply draw a straight line on a flat map and measure a very long distance, it would likely be much further than if you were to lay a string between those two points on a globe. Because of the large distance between Salzburg Airport and Laguindingan Airport, the route shown on this map most likely appears curved because of this reason.
Try it at home! Get a globe and tightly lay a string between Salzburg Airport and Laguindingan Airport. You'll see that it will travel the same route of the red line on this map!
Departure Airport Information:
IATA / ICAO Codes: | SZG / LOWS |
Airport Names: |
|
Location: | Salzburg, Austria |
GPS Coordinates: | 47°47'39"N by 13°0'11"E |
Area Served: | Salzburg, Austria |
Operator/Owner: | Salzburger Flughafen GmbH |
Airport Type: | Public |
Elevation: | 1411 feet (430 meters) |
# of Runways: | 1 |
View all routes: | Routes from SZG |
More Information: | SZG Maps & Info |
Arrival Airport Information:
IATA / ICAO Codes: | CGY / RP02 |
Airport Names: |
|
Location: | Cagayan de Oro City, Philippines |
GPS Coordinates: | 8°36'45"N by 124°27'25"E |
Area Served: | Cagayan de Oro, Iligan City |
Operator/Owner: | Civil Aviation Authority of the Philippines |
Airport Type: | Public |
# of Runways: | 1 |
View all routes: | Routes from CGY |
More Information: | CGY Maps & Info |
Facts about Salzburg Airport (SZG):
- Indoor and outdoor parking facilities are available.
- The furthest airport from Salzburg Airport (SZG) is Chatham Islands (CHT), which is located 11,905 miles (19,159 kilometers) away in Waitangi, Chatham Islands, New Zealand.
- On 1 August 1958, a control tower was put into operation after a 15-month construction period and a new terminal was opened in 1966.
- Salzburg Airport consists of the two Terminals 1 and 2.
- The closest airport to Salzburg Airport (SZG) is Linz Airport (LNZ), which is located 63 miles (101 kilometers) ENE of SZG.
- This smaller Terminal 2 features nine additional check-in counters and 4 boarding gates as well as a designated area to check-in skiing equipment.
- Salzburg Airport (SZG) currently has only 1 runway.
- In addition to being known as "Salzburg Airport", another name for SZG is "Salzburg Airport W. A. Mozart".
Facts about Laguindingan Airport (CGY):
- The furthest airport from Laguindingan Airport (CGY) is Piloto Osvaldo Marques Dias Airport (AFL), which is nearly antipodal to Laguindingan Airport (meaning Laguindingan Airport is almost on the exact opposite side of the Earth from Piloto Osvaldo Marques Dias Airport), and is located 12,342 miles (19,863 kilometers) away in Alta Floresta, Brazil.
- The closest airport to Laguindingan Airport (CGY) is Maria Cristina Airport (IGN), which is located 37 miles (60 kilometers) SSW of CGY.
- In addition to being known as "Laguindingan Airport", another name for CGY is "Paliparan ng Laguindingan (Filipino)Tugpahanan sa Laguindingan (Cebuano)".
- The approved cost of the airport project is US$ 167.09 million or ₱ 7.853 billion.
- On April 18, 2013, DOTC announced that the opening of the airport would be pushed back to June 15, 2013 instead of April 30, 2013 because CAAP has received requests from airline companies to postpone the transfer until after the summer peak season, because the April 30 opening would require the cancellation of several daily trips.
- In August 2013, the Project Development and Monitoring Facility Board has approved for the revision of the operations and maintenance of the airport.
- Laguindingan Airport (CGY) currently has only 1 runway.